docs(19.5): record the email-proof release and close its todo
This commit is contained in:
@@ -230,6 +230,26 @@ Added by the user with the reply: the 19.8 session (console commands overhaul) i
|
||||
- g15office task: **not created.** No g15office tool was available in the executing session (the g15office MCP server is not exposed to subagents). The todo's frontmatter says so; the orchestrator or the next session with the tool creates the task (type Bug or Task, description ending `Local: .planning/todos/pending/email-proof-release.md`), writes its ID into the todo, and makes it a subtask of the Phase 19.5 milestone task `onunbz3l`.
|
||||
- Task 7's verify command was not run (hold: no pin moved).
|
||||
|
||||
## Release (2026-10-21, after the hold)
|
||||
|
||||
The 19.8 session released the fix under the user's go-ahead for the v0.4.0 release (19.8-03 Task 6 reply "release v0.4.0", which delegated this decision), following `email-proof-release.md` steps 0-5. Docker gate: the probe `TestPermissionSetScan` passed in about 6 s with the NordLayer loopback rules in place.
|
||||
|
||||
| Repository | Pushed range | Tag | Checks |
|
||||
|------------|--------------|-----|--------|
|
||||
| sm-user-plugin | `c7635c5..35cf166` (`add1f7a`, `a99cb46`, `35cf166`) | `v0.1.5` (annotated) at `35cf166` | vet and short suite green through the fonoteka.go workspace |
|
||||
| sm-sociallogin-plugin | `d7ee28d..9fd58db` (`3bb5650`, `962190b`, `c4ebf05`, `79cebb9`, `9fd58db` chore: require sm-user-plugin v0.1.5) | `v0.1.2` (annotated) at `9fd58db` | vet, short suite, `GOWORK=off go build ./...` green |
|
||||
| sm-demo-app | `61a00e9..a5703f9` (`b325460` approved foreign deck commit, `f16ef6c` user bump, `1afd7ff` sociallogin bump, `a5703f9` snapshot sync from summercms `9ab28e1`) | none | `--demo` and `scripts/check-pins.sh` green after each bump; `sync-roadmap.sh --check` ok |
|
||||
| sm-bm-app | `99af8c2..cc4b23f` (`5fd0cc3`, `1e09c23` user bump, `cc4b23f` sociallogin bump) | none | `--bm` green after each bump (vitest 216 passed, typecheck) |
|
||||
| fonoteka.go | not pushed; local `2be9e1f` chore: bump sm-user-plugin to v0.1.5 | none | `--fonoteka` green; `describe --exact-match` names v0.1.5 |
|
||||
|
||||
Final pins: sm-demo-app `plugins/golem15/user` `35cf166` (v0.1.5) and `plugins/golem15/sociallogin` `9fd58db` (v0.1.2), go.mod requires sm-user-plugin v0.1.5 and sm-sociallogin-plugin v0.1.2; sm-bm-app the same gitlinks, go.mod requires sm-user-plugin v0.1.5 (sociallogin stays `v0.0.0` with its directory replace, so only its gitlink moved; go.sum unchanged); fonoteka.go gitlink `35cf166`.
|
||||
|
||||
Notes:
|
||||
- sm-sociallogin-plugin's `GOWORK=off go mod tidy` also added the framework's new indirect dependencies (charm.land v2 modules and their transitive set), because its go.mod replaces the framework with `../summercms.go`, whose master carries the 19.8 console work.
|
||||
- sm-sociallogin-plugin cannot be fetched over anonymous https; sm-demo-app's `go get` of v0.1.2 ran with a process-scoped `url.git@git.golem15.com:.insteadOf https://git.golem15.com/` (environment only, no config change). Machines that resolve the module with `GOWORK=off` need the same SSH access.
|
||||
- sm-bm-app: `go mod tidy` would also add the framework's 19.8 indirect dependencies through its `../summercms.go` replace; it was not run, so the commit changes only the require line.
|
||||
- Still open: g15office (comment on `onunbz3l`, set it to Testing, move this todo's task `sqnwn1zi` to Live) needs a session with the g15office tool; the user re-runs `/msd-verify-work 19.5`.
|
||||
|
||||
## User Setup Required
|
||||
|
||||
None.
|
||||
|
||||
@@ -64,3 +64,7 @@ D-21 order: user plugin first, then sociallogin, then the apps (user bump, then
|
||||
6. g15office: comment on the Phase 19.5 milestone task `onunbz3l` (released, awaiting re-verification), set it to Testing, and close this todo's task to Live.
|
||||
|
||||
When done: record the tags, pushed ranges and final pins in 19.5-05-SUMMARY.md (or a follow-up note), move this todo to `todos/done/`, and re-run `/msd-verify-work 19.5`.
|
||||
|
||||
## Done
|
||||
|
||||
Released 2026-10-21 by the 19.8 session (plan 19.8-03, before Task 7) under the user's "release v0.4.0" go-ahead, steps 0-5 as written: sm-user-plugin `v0.1.5` at `35cf166` (pushed `c7635c5..35cf166`), sm-sociallogin-plugin `9fd58db` chore: require sm-user-plugin v0.1.5 and `v0.1.2` (pushed `d7ee28d..9fd58db`), sm-demo-app `f16ef6c` and `1afd7ff` plus a snapshot sync `a5703f9` (pushed `61a00e9..a5703f9`, carrying `b325460`), sm-bm-app `1e09c23` and `cc4b23f` (pushed `99af8c2..cc4b23f`, carrying `5fd0cc3`), fonoteka.go `2be9e1f` local only. Tags, ranges and final pins: 19.5-05-SUMMARY.md, "Release (2026-10-21, after the hold)". Step 6 (g15office: comment on `onunbz3l`, set it to Testing, this task `sqnwn1zi` to Live) was not done: no g15office tool in that session.
|
||||