docs(35-09): record plan completion in state and roadmap
This commit is contained in:
@@ -1936,7 +1936,7 @@ Plans:
|
||||
**Requirements**: TBD
|
||||
**Depends on:** Phase 34
|
||||
**Context:** postcard already loads plugin templates and layouts from `views/mail/` (`pact.HasMailTemplates`, `postcard.BootPlugin`); this phase adds the editable database layer, admin screens and image handling on top. To confirm in discussion: partials (WinterCMS mail partials), preview and test send, per-locale variants, and whether the screens live in cabana or in a plugin.
|
||||
**Plans:** 8/9 plans executed
|
||||
**Plans:** 9/9 plans executed
|
||||
|
||||
Plans:
|
||||
**Wave 1**
|
||||
@@ -1964,4 +1964,4 @@ Plans:
|
||||
- [x] 35-08-PLAN.md — URL-scheme check on decoded attribute values instead of the whole document, a site name never stops a send (dropped with a warning) and an unsafe one is refused on the Branding form, the inlined result never stops mail, literal footer (CR-01, WR-01, WR-05), decision note
|
||||
|
||||
**Wave 9** *(gap closure tests, blocked on Wave 8 completion)*
|
||||
- [ ] 35-09-PLAN.md — regression and unit tests for CR-01, WR-01 and WR-05, new names required by `scripts/check-phase35.sh` (plus the IN-03 self-test fix), validation map
|
||||
- [x] 35-09-PLAN.md — regression and unit tests for CR-01, WR-01 and WR-05, new names required by `scripts/check-phase35.sh` (plus the IN-03 self-test fix), validation map
|
||||
|
||||
@@ -4,16 +4,16 @@ milestone: v1.0
|
||||
current_phase: 35
|
||||
current_phase_name: Mail templates and layouts editor
|
||||
status: executing
|
||||
stopped_at: Completed 35-08-PLAN.md
|
||||
last_updated: "2026-11-14T14:32:00.743Z"
|
||||
stopped_at: Completed 35-09-PLAN.md
|
||||
last_updated: "2026-11-14T15:08:54.080Z"
|
||||
last_activity: 2026-11-14
|
||||
last_activity_desc: Phase 35 execution started
|
||||
state_head: c4d0bbecc42a90f9d6c33ede91ea02c56f6b9884
|
||||
state_head: dce002ee45b49833975a0ae9a5caad63c570107c
|
||||
progress:
|
||||
total_phases: 52
|
||||
completed_phases: 37
|
||||
total_plans: 304
|
||||
completed_plans: 292
|
||||
completed_plans: 293
|
||||
gsd_state_version: "1.0"
|
||||
milestone_name: milestone
|
||||
---
|
||||
@@ -30,7 +30,7 @@ See: .planning/PROJECT.md (updated 2026-10-22)
|
||||
## Current Position
|
||||
|
||||
Phase: 35 (Mail templates and layouts editor) — EXECUTING
|
||||
Plan: 2 of 9
|
||||
Plan: 9 of 9
|
||||
Status: Ready to execute
|
||||
Last activity: 2026-11-14 — Phase 35 execution started
|
||||
|
||||
@@ -321,6 +321,7 @@ Progress: [████████░░] 82%
|
||||
| Phase 35 P06 | 33 min | 3 tasks | 34 files |
|
||||
| Phase 35 P07 | 49 min | 3 tasks | 11 files |
|
||||
| Phase 35 P08 | 24 min | 3 tasks | 22 files |
|
||||
| Phase 35 P09 | 31min | 3 tasks | 6 files |
|
||||
|
||||
## Accumulated Context
|
||||
|
||||
@@ -1129,6 +1130,7 @@ Recent decisions affecting current work:
|
||||
- [Phase 35]: 35-08: postcard.UnsafeText (new exported API) drops unsafe site names at render with a value-free rate-limited warning and backs the Branding 422 on site_name (mail.brand.site_name_unsafe)
|
||||
- [Phase 35]: 35-08: an inlined result that fails the safety check is sent un-inlined with the inline:<layout> warning; the footer partial's text argument prints the site name literally
|
||||
- [Phase 35]: 35-08: cabana settings Put localizes BeforeValidate refusal phrase keys, as controller saves do
|
||||
- [Phase 35]: 35-09: the mail screens test env reads mail.from from its configuration (default unchanged) so a mutate hook sets the sender
|
||||
|
||||
### Pending Todos
|
||||
|
||||
@@ -1276,6 +1278,6 @@ Items acknowledged and carried forward from previous milestone close:
|
||||
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-11-14T14:31:37.513Z
|
||||
Stopped at: Completed 35-08-PLAN.md
|
||||
Last session: 2026-11-14T15:08:11.773Z
|
||||
Stopped at: Completed 35-09-PLAN.md
|
||||
Resume file: None
|
||||
|
||||
Reference in New Issue
Block a user