docs(35-02): record plan progress in state and roadmap

Co-authored-by: Cursor <cursoragent@cursor.com>
This commit is contained in:
2026-11-13 13:05:49 +01:00
parent 399ba5fb60
commit da6bfa9e48
2 changed files with 16 additions and 12 deletions

View File

@@ -1912,14 +1912,14 @@ Plans:
**Requirements**: TBD
**Depends on:** Phase 34
**Context:** postcard already loads plugin templates and layouts from `views/mail/` (`pact.HasMailTemplates`, `postcard.BootPlugin`); this phase adds the editable database layer, admin screens and image handling on top. To confirm in discussion: partials (WinterCMS mail partials), preview and test send, per-locale variants, and whether the screens live in cabana or in a plugin.
**Plans:** 1/4 plans executed
**Plans:** 2/4 plans executed
Plans:
**Wave 1**
- [x] 35-01-PLAN.md — pact `HasMailPartials`, postcard-owned mail tables and migrations, per-send override lookup with file fallback, partials, sample vars, Branding CSS, index sync, Editor API, docs
**Wave 2** *(blocked on Wave 1 completion)*
- [ ] 35-02-PLAN.md — cabana Settings → Mail screens, two permission codes, reset/delete rules, drift notice and diff, server field types, preview and own-address test send, OpenAPI, en/pl copy
- [x] 35-02-PLAN.md — cabana Settings → Mail screens, two permission codes, reset/delete rules, drift notice and diff, server field types, preview and own-address test send, OpenAPI, en/pl copy
**Wave 3** *(blocked on Wave 2 completion)*
- [ ] 35-03-PLAN.md — admin SPA: CodeMirror decision note and checkpoint, codeeditor/colour/image fields, image picker, mail preview and test send, rebuilt dist

View File

@@ -4,16 +4,16 @@ milestone: v1.0
current_phase: 35
current_phase_name: Mail templates and layouts editor
status: executing
stopped_at: Completed 35-01-PLAN.md
last_updated: "2026-11-13T10:28:52.958Z"
stopped_at: Completed 35-02-PLAN.md
last_updated: "2026-11-13T12:05:49.081Z"
last_activity: 2026-11-13
last_activity_desc: Phase 35 execution started
state_head: 7b25fcff5542abd72df18742aaab435ba8c8b132
last_activity_desc: Phase 35 execution resumed (wave continue)
state_head: 399ba5fb60c907dd0e3f48a111145ac698385d92
progress:
total_phases: 52
completed_phases: 37
total_plans: 288
completed_plans: 285
total_plans: 299
completed_plans: 286
gsd_state_version: "1.0"
milestone_name: milestone
---
@@ -30,9 +30,9 @@ See: .planning/PROJECT.md (updated 2026-10-22)
## Current Position
Phase: 35 (Mail templates and layouts editor) — EXECUTING
Plan: 2 of 4
Plan: 3 of 4
Status: Ready to execute
Last activity: 2026-11-13 — Phase 35 execution started
Last activity: 2026-11-13 — Phase 35 execution resumed (wave continue)
Progress: [████████░░] 82%
@@ -314,6 +314,7 @@ Progress: [████████░░] 82%
| Phase 33 P16 | 19min | 4 tasks | 41 files |
| Phase 33 P15 | 2h15m | 6 tasks | 70 files |
| Phase 35 P01 | 55 min | 5 tasks | 30 files |
| Phase 35 P02 | 77 | 4 tasks | 66 files |
## Accumulated Context
@@ -1103,6 +1104,9 @@ Recent decisions affecting current work:
- [Phase 35]: 35-01: Editor.Validate refuses a template body whose source holds a script, iframe, object or embed tag, because Markdown would drop it silently at send
- [Phase 35]: 35-01: Branding (compiled CSS and logoUrl) also applies to the file version sent after a failing override; an invalid stored colour keeps mail.brandCss with a warning
- [Phase 35]: 35-01: pact has five row states; cabana keeps only three until 35-02 updates rowStateOrder and docs/backend/lists-and-filters.md
- [Phase 35]: Image list/pick allows either mail permission; upload and Mail images singleton need system.manage_mail_layouts — Planner call for picker split (D-03 / UI-SPEC C4)
- [Phase 35]: Test-send is interactive-only; recipient is always the signed-in administrator email; limit 5/10min via cooler.Attempter — D-16/D-17 and research Pattern 7
- [Phase 35]: GET /mail/images documents AdminMailImagesResponse so meta.canUpload validates under OpenAPI conformance — SuccessMeta cannot carry canUpload; MarketplaceResponse pattern
### Pending Todos
@@ -1250,6 +1254,6 @@ Items acknowledged and carried forward from previous milestone close:
## Session Continuity
Last session: 2026-11-13T10:10:59.057Z
Stopped at: Completed 35-01-PLAN.md
Last session: 2026-11-13T12:05:28.777Z
Stopped at: Completed 35-02-PLAN.md
Resume file: None