docs(19.1-01): record plan progress after userfriends SUMMARY

Advance Phase 19.1 to plan 2 of 6 and tick 19.1-01 on the roadmap now that the sibling plugin is on origin/main.

Co-authored-by: Cursor <cursoragent@cursor.com>
This commit is contained in:
Jakub Zych
2026-10-18 13:22:15 +02:00
parent 03591e1d6c
commit eb341147d8
4 changed files with 26 additions and 22 deletions

View File

@@ -1235,11 +1235,11 @@ Plans:
3. Already met: fonoteka's PHP userfriends tree equals Wavepath 182b514; fonoteka.go has no port and Wavepath's copy is the single source.
4. The new code has unit tests, delivered in the phase's last plan.
**Plans:** 6 plans
**Plans:** 1/6 plans executed
Plans:
**Wave 1**
- [ ] 19.1-01-PLAN.md — userfriends repo, baseline, friends HTTP tracer, group events, soft chat adapter, GDPR
- [x] 19.1-01-PLAN.md — userfriends repo, baseline, friends HTTP tracer, group events, soft chat adapter, GDPR
- [ ] 19.1-03-PLAN.md — chatbots repo, bot_flags, slash-command dispatcher, /ping tracer (no AI-plugin import)
- [ ] 19.1-04-PLAN.md — webpush-go note, then herald subscriptions, PublicOnly send, rollback-sends-0 tracer
@@ -1434,7 +1434,7 @@ Phases execute in numeric order: 1 → 2 → 3 → 4 → 5 → 6 → 7 → 8 →
| 18. Payment Gateway | 8/8 | Complete | 2026-10-14 |
| 18.1. Payment Gateway Subscriptions | 9/9 | Complete | 2026-10-16 |
| 19. Chat and ChatChannels | 7/7 | Complete | 2026-10-17 |
| 19.1. Chat satellites | 0/TBD | Not started | - |
| 19.1. Chat satellites | 1/6 | In Progress| |
| 19.2. Chat polish against WavePath clients | 0/TBD | Not started | - |
| 19.3. Framework transport and infrastructure for WavePath | 6/6 | In Progress| |
| 19.4. OIDC provider on wristband | 0/TBD | Not started | - |

View File

@@ -4,16 +4,16 @@ milestone: v1.0
current_phase: "19.1"
current_phase_name: Chat satellites
status: executing
stopped_at: Phase 19.7 context gathered
last_updated: "2026-10-18T10:56:18.421Z"
last_activity: 2026-10-17
last_activity_desc: Phase 19 complete, transitioned to Phase 19.1
state_head: cddf3a5008d9832a881f89900a961aa6281c05d8
stopped_at: Completed 19.1-01-PLAN.md
last_updated: "2026-10-18T11:21:54.803Z"
last_activity: 2026-10-18
last_activity_desc: Phase 19.1 execution started
state_head: 03591e1d6c90cc9953054214de2c4e0836c376cd
progress:
total_phases: 41
completed_phases: 33
total_plans: 204
completed_plans: 198
completed_plans: 199
gsd_state_version: "1.0"
milestone_name: milestone
---
@@ -25,14 +25,14 @@ milestone_name: milestone
See: .planning/PROJECT.md (updated 2026-10-12)
**Core value:** An existing WinterCMS-shaped app can be ported plugin by plugin to a single Go binary without its frontend noticing: the PHP version's API contract is the acceptance test.
**Current focus:** Phase 19 — Chat and ChatChannels
**Current focus:** Phase 19.1 — Chat satellites
## Current Position
Phase: 19.1 (Chat satellites) — READY TO EXECUTE
Plan: Not started
Phase: 19.1 (Chat satellites) — EXECUTING
Plan: 2 of 6
Status: Ready to execute
Last activity: 2026-10-17 — Phase 19 complete, transitioned to Phase 19.1
Last activity: 2026-10-18 — Phase 19.1 execution started
Progress: [████████░░] 80%
@@ -251,6 +251,7 @@ Progress: [████████░░] 80%
| Phase 18.1 P08 | 24 min | 4 tasks | 30 files |
| Phase 18.1 P09 | 60min | 5 tasks | 27 files |
| Phase 19 P01 | 80min | 3 tasks | 34 files |
| Phase 19.1 P01 | 12min | 3 tasks | 37 files |
## Accumulated Context
@@ -847,6 +848,9 @@ Recent decisions affecting current work:
- [Phase 18.1]: 18.1-09: framework release tag is v0.2.1 (v0.1.27 and v0.2.0 already on origin); first plugin tags pgsub v0.1.0 and pgstripe v0.1.0, pgstripe requires pgsub v0.1.0, replace lines kept
- [Phase 19]: 19-01: Task 1 reply proceed-and-push; sm-chat-plugin created and main pushed at b93cae7
- [Phase 19]: 19-01: D-01 names, D-04 baseline 202610160001_create_golem15_chat_baseline, D-12 rewrite-as-both locked
- [Phase 19.1]: Task 1 reply verbatim: proceed-and-push
- [Phase 19.1]: Locked D-01 names, D-02 baseline 202610180001_create_golem15_userfriends_baseline, D-05 prefix /_userfriends/api/v1
- [Phase 19.1]: tea repos create --owner golem15 --name sm-userfriends-plugin succeeded; main pushed at 2480ff0 (never force). summercms.go was not pushed.
### Pending Todos
@@ -929,6 +933,6 @@ Items acknowledged and carried forward from previous milestone close:
## Session Continuity
Last session: 2026-10-18T10:41:47.861Z
Stopped at: Phase 19.7 context gathered
Resume file: .planning/phases/19.7-generic-mcp-module/19.7-CONTEXT.md
Last session: 2026-10-18T11:21:54.090Z
Stopped at: Completed 19.1-01-PLAN.md
Resume file: None

View File

@@ -20,9 +20,9 @@ affects: [19.1-02, 19.1-06, sm-forum-plugin, sm-chat-plugin]
actuals:
tokens: 40250
tasks: 3
commits: 1
commits: 2
plan_head_before: 36634313afd252c8f7a5becdca420c56603d1ac6
plan_head_after: pending-summary-commit
plan_head_after: 03591e1d6c90cc9953054214de2c4e0836c376cd
tech-stack:
added: []
@@ -146,7 +146,7 @@ Each remaining task was committed atomically. Task 1 wrote no files.
2. **Task 2: Tracer (plugin repo + ROADMAP)** - `dac506a` (feat, sibling) and `f984e5e` (docs, summercms.go)
3. **Task 3: Groups, events, chat adapter, GDPR, remaining routes** - `2480ff0` (feat, sibling)
**Plan metadata:** pending-summary-commit (docs: complete plan)
**Plan metadata:** `03591e1` (docs: complete plan)
**Sibling HEAD:** `2480ff0` on `origin/main`.

View File

@@ -211,8 +211,8 @@
],
"next": {
"command": "/msd:progress --next",
"label": "Advance to the next step (plan phase 19.1)",
"reason": "Phase 19.1 of 41 — needs a plan"
"label": "Advance to the next step",
"reason": "Phase 19.1 of 41 · executing"
},
"updated_at": "2026-10-17T20:41:56.065Z"
"updated_at": "2026-10-18T11:21:49.771Z"
}