Commit Graph

787 Commits

Author SHA1 Message Date
Jakub Zych
e8f5b1c89c docs(19.8): gap-closure plans for the code review findings and v0.4.2 2026-10-22 01:03:48 +02:00
Jakub Zych
dd123821d2 docs(19.8): code review of the console overhaul 2026-10-22 00:35:55 +02:00
Jakub Zych
0b1d7e5a79 docs(19.8): record code review disposition 2026-10-22 00:35:50 +02:00
Jakub Zych
6c2164ad38 docs(19.8-04): v0.4.1 released; roadmap progress 4/4 plans 2026-10-22 00:22:02 +02:00
Jakub Zych
2ca68f897d docs(19.8-04): record the Task 5 reply (release v0.4.1) 2026-10-22 00:14:21 +02:00
Jakub Zych
295c1c1ee7 docs(19.6.1): create phase plan
Three plans per D-22: server side, SPA support (D-21), tests.
D-12 amended: a password set for another admin keeps their personal
API tokens, as admin:reset-password does. Research open questions
marked resolved.
2026-10-22 00:13:40 +02:00
Jakub Zych
a7431c34f0 docs(19.8-04): unit tests and gate executed, post-release fix awaiting go-ahead 2026-10-21 19:58:37 +02:00
Jakub Zych
b906a31c36 docs(19.6.1): UI design contract 2026-10-21 18:33:12 +02:00
Jakub Zych
2e4f85fc50 docs(19.8-03): complete the console sweep and v0.4.0 release plan 2026-10-21 18:24:59 +02:00
Jakub Zych
053c643527 docs(19.6.1): record post-research decisions D-19..D-22 2026-10-21 18:18:24 +02:00
Jakub Zych
77cf27eb24 docs(phase-19.6.1): add validation strategy 2026-10-21 18:16:34 +02:00
Jakub Zych
fff19e5e33 docs(19.6.1): research phase domain 2026-10-21 18:15:54 +02:00
Jakub Zych
a37bdbc4eb docs(19.6.1): capture phase context 2026-10-21 17:53:44 +02:00
Jakub Zych
a0ad2b5fa3 docs: insert phase 19.6.1 Backend Administrators screen; record 19.7 post-research decisions 2026-10-21 17:42:56 +02:00
Jakub Zych
39c0c42db7 docs(phase-19.7): add validation strategy 2026-10-21 17:38:00 +02:00
Jakub Zych
336ec2e0b6 docs(phase-19.7): add research 2026-10-21 17:38:00 +02:00
Jakub Zych
2ad7f539e3 docs(19.6): create phase plan 2026-10-21 16:33:26 +02:00
Jakub Zych
25ee333930 docs(phase-19.6): add pattern map 2026-10-21 15:58:39 +02:00
Jakub Zych
5c474b4a4f docs(phase-19.6): lock post-research decisions D-18 to D-20 2026-10-21 15:54:53 +02:00
Jakub Zych
c8cbcd5cc7 docs(phase-19.6): add research and validation strategy 2026-10-21 15:50:48 +02:00
Jakub Zych
99b6df44d6 docs(19.5): record the email-proof release and close its todo 2026-10-21 15:33:05 +02:00
Jakub Zych
08a52890c6 docs(19.5): verification passed on recorded UAT 2026-10-21 15:10:40 +02:00
Jakub Zych
ff4e0fa7ad docs(phase-19.5): add security threat verification 2026-10-21 15:10:32 +02:00
Jakub Zych
f1fa9e05ba test(19.5): UAT 2 passed on the automated callback view test 2026-10-21 15:09:34 +02:00
Jakub Zych
d3323efbe2 test(19.5): complete UAT - 3 passed, 0 issues 2026-10-21 15:06:54 +02:00
Jakub Zych
ff0e3a6c69 docs(19.5): record the last UAT answers (prohibitions, CR-02 wording) 2026-10-21 15:06:40 +02:00
Jakub Zych
8af7c22cfc docs(19.5): re-verification after gap closure 05 and UAT items 2026-10-21 15:01:58 +02:00
Jakub Zych
074a8f250e test(19.5): record gap-closure UAT results 2026-10-21 14:54:14 +02:00
Jakub Zych
5ddb23d241 docs(19.5-05): complete the email-proof plan, release on hold 2026-10-21 14:52:30 +02:00
Jakub Zych
b57d2e109d docs(19.5-05): draft at the Task 6 checkpoint (bm view test, review, release table) 2026-10-21 14:48:24 +02:00
Jakub Zych
8c7794efa2 docs(19.5): proof of address in the security review and validation map
- T-19.5-38 describes the proof as email_verified_at; T-19.5-39..46 added;
  T-19.5-26 closed by OAuthCallbackView.test.ts; CR-02 recorded as open
- validation rows 19.5-05-01..07 and D-26, D-27, D-28
2026-10-21 14:46:38 +02:00
Jakub Zych
c2c8c6a2f9 docs(19.5-05): hand-off draft after Task 3 (email proof in user and sociallogin) 2026-10-21 14:07:35 +02:00
Jakub Zych
128d1985a1 docs(19.8-02): complete bonfire console layer plan 2026-10-21 12:32:35 +02:00
Jakub Zych
7dbf6d1a45 docs(19.8-01): complete diary logging plan 2026-10-21 11:59:50 +02:00
Jakub Zych
71b99317ad docs(19.5): gap-closure plan 05 for email-proof auto-link and bm callback view test 2026-10-21 11:53:54 +02:00
Jakub Zych
bde7d9fcb7 docs(19.8): create phase plan 2026-10-21 02:54:17 +02:00
Jakub Zych
deff424c4f test(19.5): persist human verification items as UAT 2026-10-21 02:24:58 +02:00
Jakub Zych
a999055cbf docs(19.5): add verification report 2026-10-21 02:24:54 +02:00
Jakub Zych
b73f9d971f docs(19.5): add code review report 2026-10-21 02:24:54 +02:00
Jakub Zych
cdd647243c docs(19.5-04): complete unit tests, PHP map, security review and v0.1.1 plan 2026-10-21 02:15:06 +02:00
Jakub Zych
f38713f540 docs(19.5): close T-19.5-38 in the security review 2026-10-21 02:07:44 +02:00
Jakub Zych
cdddaa384f docs(phase-19.8): add pattern map 2026-10-21 02:07:08 +02:00
Jakub Zych
09fd4d0712 docs(phase-19.8): record post-research decisions D-23..D-30 2026-10-21 02:04:31 +02:00
Jakub Zych
e830298862 docs(19.5): security review and validation map 2026-10-21 01:35:09 +02:00
Jakub Zych
63a85a8a65 docs(phase-19.8): add research and validation strategy 2026-10-21 01:14:16 +02:00
Jakub Zych
bc5a9dbc17 docs(19.8): capture phase context 2026-10-21 00:36:29 +02:00
Jakub Zych
0a87d64d4e docs(19.5-03): complete adoption plan
sm-sociallogin-plugin mounted in sm-demo-app and sm-bm-app (Microsoft 365
with the frontend callback, consent and link-ticket views), fonoteka.go
pinned to sm-user-plugin v0.1.4. User setup for the Entra registration;
one unrelated fonoteka route-inventory failure deferred.
2026-10-21 00:30:00 +02:00
Jakub Zych
ecc77a3f6b docs(19.5-02): complete social sign-in plugin plan
- sm-sociallogin-plugin v0.1.0 (private repo), pinned to summercms v0.3.1
  and sm-user-plugin v0.1.4, all pushed and tagged in D-21 order
- v0.3.1 changelog posted after the User-Agent fix (fix-ua)
2026-10-21 00:07:28 +02:00
Jakub Zych
c996790808 docs(roadmap): renumber console commands overhaul from phase 32 to 19.8 2026-10-21 00:01:24 +02:00
Jakub Zych
5cf5c4f0dc docs(roadmap): add phase 32 console commands overhaul 2026-10-20 23:58:13 +02:00