Commit Graph

743 Commits

Author SHA1 Message Date
dbdf15da76 docs(14.2-03): complete vue-fonoteka-app on Go backend plan 2026-10-11 23:06:04 +02:00
a2d19360d2 docs(14.2-03): PHP cross-check and re-verification recorded in UAT 2026-10-11 23:04:28 +02:00
b9de0610d7 docs(14.2-03): record the manual session, its findings and fixes in UAT 2026-10-11 20:34:55 +02:00
66dbd5a64a docs(14.2-03): UAT record with the deferred PHP cross-check 2026-10-11 19:46:44 +02:00
48286b67b3 docs(17): create phase plan 2026-10-11 19:28:15 +02:00
05442174b6 docs(14.2-02): complete local stack start script plan 2026-10-11 19:08:45 +02:00
5c75b316a7 docs(17): UI design contract 2026-10-11 18:23:09 +02:00
3156baaf38 docs(phase-17): add validation strategy 2026-10-11 18:01:12 +02:00
ea8408e9e9 docs(17): research phase domain 2026-10-11 18:00:21 +02:00
2158db790c docs(14.2-01): record plan 01 progress in state and roadmap 2026-10-11 17:48:43 +02:00
d0eeb4d291 docs(14.2-01): complete Go-side local stack glue plan 2026-10-11 17:48:18 +02:00
ad1fa5abfa docs(14.2-01): todo for sm-user-plugin commands that need a published database 2026-10-11 17:41:29 +02:00
3408742fb0 test(10): persist human verification items as UAT 2026-10-11 17:13:01 +02:00
f31ea9387f docs(10): re-verify after go-stage fixes, phase 10 human_needed 2026-10-11 17:12:55 +02:00
fc7cfaf51c docs(10): re-verify after quick-261011-mag, hygiene closed, gaps_found on --all go stage 2026-10-11 16:29:35 +02:00
6c7434243e docs(quick-261011-mag): fix check-phase10.sh hygiene gaps from 10-VERIFICATION.md 2026-10-11 16:14:20 +02:00
d2fa195a91 docs(10): re-verify stale phase 10 report, gaps_found on check-phase10 hygiene gate 2026-10-11 15:54:52 +02:00
07e579a264 docs(09): re-verify after quick-261011-kzi, phase 09 passed 2026-10-11 15:40:54 +02:00
be82bccfc3 docs(quick-261011-kzi): fix Phase 09 gaps (fonoteka route inventory, per-guard token throttle) 2026-10-11 15:21:03 +02:00
21fdcfcba6 docs(09): re-verify stale phase 09 report, gaps_found on fonoteka route inventory 2026-10-11 15:03:11 +02:00
a3b502bfb9 docs: record -short test fix in STATE 2026-10-11 14:43:52 +02:00
ee6fc7a235 docs(quick-261011-joh): record passing Docker-backed test re-run 2026-10-11 14:31:46 +02:00
290713cce3 docs(quick-261011-joh): sieve generic collection helpers module 2026-10-11 14:28:16 +02:00
b906bdd48b docs(phase-16.3): complete phase execution 2026-10-11 14:08:47 +02:00
5913337cda docs(16.3): verification passed after admin gate fix
Re-verify after d1b043a: SC-6 closed, check-phase16.3.sh --all green, score 6/6.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-11 14:08:06 +02:00
502fae3e90 docs(16.3): mark WR-01 and WR-02 review findings fixed
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-11 13:53:50 +02:00
e368ae9c85 docs(16.3): record code review disposition 2026-10-11 13:48:56 +02:00
36b1bce5c5 docs(16.3): add code review report 2026-10-11 13:48:16 +02:00
f4395b57b7 docs(16.3-04): point STATE state_head at SUMMARY commit
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-11 13:42:12 +02:00
e565062479 docs(16.3-04): complete unit tests and phase gate plan
Record SUMMARY, advance STATE/ROADMAP to 4/4 plans executed, and
mark Phase 16.3 ready for verify-work after the gate passed.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-11 13:42:12 +02:00
463541549f docs(16.3): complete validation map with nyquist_compliant
Fill every 16.3-VALIDATION.md row from plan 04 results, tick Wave 0,
and set nyquist_compliant true after the phase gate passed.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-11 13:40:53 +02:00
c385dc79eb docs(16.3-03): complete Journal scopes and v0.1.21 release plan 2026-10-11 13:08:54 +02:00
611f98e33b docs(16.3-02): advance STATE and ROADMAP after plan 02
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-11 02:08:18 +02:00
fd07e2637f docs(16.3-02): complete admin SPA API tokens card plan
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-11 02:07:48 +02:00
3f9d3b4f11 docs: sync todos with g15office and map phases to milestone tasks
Tag the 17 open todos with their g15office task IDs, close 7 todos that
are already done or promoted to Phase 16.3, and record the sync rules
and the phase-to-task map in .planning/G15OFFICE.md.
2026-10-11 02:01:50 +02:00
93a3112fb7 docs(16.3-01): advance STATE and ROADMAP after plan 01
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-11 01:56:26 +02:00
3019ab188b docs(16.3-01): complete framework personal API tokens plan
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-11 01:56:03 +02:00
4d107f4ccb docs: capture todo - uploads keep the client extension (stored XSS, g15office bemfi2zs) 2026-10-11 01:35:37 +02:00
c53ae6a39b docs(16.3): create phase plan 2026-10-11 01:05:56 +02:00
1821f92bee docs: capture todo - prompt open tabs to reload when a new version is deployed 2026-10-11 01:05:05 +02:00
87953f68bf docs: capture exploration — wavepath framework asks as phases 19.2 to 19.6 2026-10-11 00:36:09 +02:00
5e3c552aa1 docs(phase-16.3): add validation strategy 2026-10-11 00:18:10 +02:00
9907fa94cd docs(16.3): research phase domain 2026-10-11 00:17:32 +02:00
941ae80b86 docs(16.3): UI design contract 2026-10-11 00:05:21 +02:00
a04ba35271 docs(16.2): re-verify after gap closure 16.2-07 and UAT; phase complete
16.2-VERIFICATION.md passed 14/14: the five human items are resolved by the
16.2-07 gate log and the UAT re-run on v0.1.20 (16.2-UAT.md 5/5). covered_files
adds 16.2-07 PLAN/SUMMARY and openapi_conformance_test.go; digest recomputed
with verification.fingerprint. Re-verified by hand because msd-core 1.14.0
re-stales a report after gap closure and its verifier ignores passed UAT.
STATE points at 16.3 (phase.complete picked 11, an executed phase that is
only stale).
2026-10-10 23:39:54 +02:00
ed8210132e test(16.2): UAT complete - 5 passed after the 16.2-07 gap closure 2026-10-10 21:49:59 +02:00
e1703c7489 docs(16.2-07): complete gap closure plan; UAT Tests 2 and 3 pass on v0.1.20
Purge token set on UAT, restart at 2026-10-10T17:57:57Z, smoke, token-match
and purge-ok pass. posts-unchanged, translations-unchanged, category-purged
and category-fresh pass after the human re-saves. Debug sessions for
G-16.2-1 and G-16.2-2 resolved.
2026-10-10 21:05:47 +02:00
aba063f723 docs(16.2): route checklist names openapi_conformance_test.go; 16.2-07 rows in the validation map
- PATTERNS: one conformCase per new admin route, enforced by
  TestPhase10ConformanceInventory without Docker (G-16.2-1)
- VALIDATION: 16.2-07-T1 to T6 rows; the Docker-host suites now run in the
  gate's postgres stage instead of the Manual-Only table
2026-10-10 18:44:34 +02:00
d0b7fe4571 docs(16.2): create gap closure plan 07 for G-16.2-1 and G-16.2-2 2026-10-10 17:56:56 +02:00
9447fedca0 docs(16.2): record the cache purge decision for G-16.2-2 2026-10-10 17:34:16 +02:00