Two gap-closure plans confirmed by the user: - 35-08: URL-scheme check on decoded attribute values instead of the whole document, unsafe site names dropped at render with a warning and refused on the Branding form (postcard.UnsafeText), the inlined result never stops mail, literal site name in the footer (CR-01, WR-01, WR-05) - 35-09: regression and unit tests, new names required by check-phase35.sh, IN-03 self-test fix, validation map