docs(35-07): update state and roadmap after plan 35-07
This commit is contained in:
@@ -1936,7 +1936,7 @@ Plans:
|
||||
**Requirements**: TBD
|
||||
**Depends on:** Phase 34
|
||||
**Context:** postcard already loads plugin templates and layouts from `views/mail/` (`pact.HasMailTemplates`, `postcard.BootPlugin`); this phase adds the editable database layer, admin screens and image handling on top. To confirm in discussion: partials (WinterCMS mail partials), preview and test send, per-locale variants, and whether the screens live in cabana or in a plugin.
|
||||
**Plans:** 6/7 plans executed
|
||||
**Plans:** 7/7 plans executed
|
||||
|
||||
Plans:
|
||||
**Wave 1**
|
||||
@@ -1958,4 +1958,4 @@ Plans:
|
||||
- [x] 35-06-PLAN.md — finished default/system/minimal layouts (logo or site name header, card, footer), Branding site name, CSS inlining via go-premailer with a per-layout opt-out, decision note superseding D-10
|
||||
|
||||
**Wave 7** *(gap closure, blocked on Wave 6 completion)*
|
||||
- [ ] 35-07-PLAN.md — unit tests for both gaps and `scripts/check-phase35.sh` with a read-only scratch-modfile consumers stage
|
||||
- [x] 35-07-PLAN.md — unit tests for both gaps and `scripts/check-phase35.sh` with a read-only scratch-modfile consumers stage
|
||||
|
||||
@@ -4,16 +4,16 @@ milestone: v1.0
|
||||
current_phase: 35
|
||||
current_phase_name: mail-templates-and-layouts-editor
|
||||
status: verifying
|
||||
stopped_at: Completed 35-06-PLAN.md
|
||||
last_updated: "2026-11-13T20:19:22.746Z"
|
||||
stopped_at: Completed 35-07-PLAN.md
|
||||
last_updated: "2026-11-13T21:11:21.424Z"
|
||||
last_activity: 2026-11-13
|
||||
last_activity_desc: Phase 35 execution started
|
||||
state_head: be9170af53047e0bbbde8edc0cdac394a19bbbc7
|
||||
state_head: d00e2c8d6fd1ce688503a47ba127b02cff4e915f
|
||||
progress:
|
||||
total_phases: 52
|
||||
completed_phases: 37
|
||||
total_plans: 302
|
||||
completed_plans: 290
|
||||
completed_plans: 291
|
||||
gsd_state_version: "1.0"
|
||||
milestone_name: milestone
|
||||
---
|
||||
@@ -319,6 +319,7 @@ Progress: [████████░░] 82%
|
||||
| Phase 35 P04 | 90 | 4 tasks | 40 files |
|
||||
| Phase 35 P05 | 28 min | 3 tasks | 29 files |
|
||||
| Phase 35 P06 | 33 min | 3 tasks | 34 files |
|
||||
| Phase 35 P07 | 49 min | 3 tasks | 11 files |
|
||||
|
||||
## Accumulated Context
|
||||
|
||||
@@ -1120,6 +1121,9 @@ Recent decisions affecting current work:
|
||||
- [Phase 35]: 35-06: postcard inlines mail CSS at render with github.com/vanng822/go-premailer v1.38.0 (default options), opt-out via disable_auto_inline_css (layout header key, layouts column, layout form switch); supersedes D-10's inlining claim
|
||||
- [Phase 35]: 35-06: Branding gains Site name (site_name, Brand.SiteName); empty uses the display name of mail.from; default and system layouts show logo or name in the header and a © year name footer
|
||||
- [Phase 35]: 35-06: 35-01's default.htm-unchanged gate lifted; default layout is WinterCMS's default layout on new built-in header and footer partials
|
||||
- [Phase 35]: 35-07: check-phase35.sh consumers run each core plugin through a scratch -modfile (sibling go.sum merged with the framework's, GOWORK=off, GOPROXY=off) and refuse a sibling that is dirty before or after
|
||||
- [Phase 35]: 35-07: G-35-8 recorded as framework-closed with the plugin part deferred; UAT test 8 re-run scoped to the built-in layouts (default, system) with logo, site name and the button partial
|
||||
- [Phase 35]: 35-07: Branding site name with a URL scheme stays an open item; TestMailBrandSiteName pins the current behaviour (saved, preview refused)
|
||||
|
||||
### Pending Todos
|
||||
|
||||
@@ -1267,6 +1271,6 @@ Items acknowledged and carried forward from previous milestone close:
|
||||
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-11-13T20:19:21.645Z
|
||||
Stopped at: Completed 35-06-PLAN.md
|
||||
Last session: 2026-11-13T21:11:20.401Z
|
||||
Stopped at: Completed 35-07-PLAN.md
|
||||
Resume file: None
|
||||
|
||||
Reference in New Issue
Block a user