- Security review names the test that fails if each high control is removed. - Validation rows now point at the phase gate commands. - Roadmap shows 12/12 plans executed.
81 lines
5.7 KiB
Markdown
81 lines
5.7 KiB
Markdown
---
|
|
phase: "09"
|
|
slug: "backend-admin-authentication-and-schema-pipeline"
|
|
status: approved
|
|
nyquist_compliant: true
|
|
wave_0_complete: false
|
|
created: "2026-09-24"
|
|
---
|
|
|
|
# Phase 09 — Validation Strategy
|
|
|
|
> Per-phase validation contract for feedback sampling during execution.
|
|
|
|
---
|
|
|
|
## Test Infrastructure
|
|
|
|
| Property | Value |
|
|
|----------|-------|
|
|
| **Framework** | Go 1.27 standard `testing`; existing Testcontainers-backed PostgreSQL integration harness |
|
|
| **Config file** | none — package-local `*_test.go` files and repository `go.work` workspaces |
|
|
| **Quick run command** | `go test ./bouncer ./pact ./lagoon ./party ./surf` |
|
|
| **Full suite command** | `go test ./... && (cd ../fonoteka.go && go test ./...)` |
|
|
| **Estimated runtime** | Focused package checks should complete within 60 seconds; full two-repository and Testcontainers runs may take several minutes |
|
|
|
|
---
|
|
|
|
## Sampling Rate
|
|
|
|
- **After every task commit:** Run the narrowest affected package tests plus `go vet ./...` in the modified workspace.
|
|
- **After every plan wave:** Run `go test ./...` in both `summercms.go` and `fonoteka.go`.
|
|
- **Before `$gsd-verify-work`:** Full suites and the assembled admin authorization matrix must be green.
|
|
- **Max feedback latency:** 60 seconds for task-level checks; multi-minute integration runs are reserved for wave and phase gates.
|
|
|
|
---
|
|
|
|
## Per-Task Verification Map
|
|
|
|
| Task ID | Plan | Wave | Requirement | Threat Ref | Secure Behavior | Test Type | Automated Command | File Exists | Status |
|
|
|---------|------|------|-------------|------------|-----------------|-----------|-------------------|-------------|--------|
|
|
| 09-01-T2 | 09-01 | 1 | AUTH-08 | T-09-01, T-09-02 | Backend/frontend token crossover and permission-order denial both fail before schema/database work | unit + assembled integration | `go test ./bouncer ./cabana -run '^TestPhase09(GuardIsolation\|PermissionMatrix)$' -count=1` | yes | green |
|
|
| 09-03-T1 | 09-03 | 3 | ADMIN-01 | T-09-05 | Strict schema compilation covers every field type and rejects unknown keys/types/partials/providers | unit | `go test ./cabana -run '^TestFormSchema(Compile\|Rejects)' -count=1` | yes | green |
|
|
| 09-04-T3 | 09-04 | 4 | ADMIN-02 | T-09-07, T-09-08 | Search/sort/filter/scope selectors are compiled allowlists and adjacent pages are deterministic | unit + assembled | `go test ./cabana -run '^TestPhase09SecurityCoverage$' -count=1 && (cd ../fonoteka.go && go test ./plugins/golem15/fonoteka -run '^TestPhase09AssembledAcceptance$' -count=1)` | yes | green |
|
|
| 09-10-T3 | 09-10 | 7 | ADMIN-03 | T-09-16, T-09-17 | Relation permission and forged pivot payloads fail closed | unit + PostgreSQL | `go test ./cabana -run '^TestPhase09SecurityCoverage$' -count=1 && (cd ../fonoteka.go && go test ./plugins/golem15/fonoteka -run '^TestCollectionsAdmin(RelationPermissions\|ForgedPivot\|CrossScope)$' -count=1)` | yes | green |
|
|
| 09-05-T3 | 09-05 | 5 | ADMIN-04 | T-09-09, T-09-10 | Writable projection and hook rollback reject mass assignment and partial creates | unit + PostgreSQL | `go test ./cabana -run '^TestPhase09SecurityCoverage$' -count=1` | yes | green |
|
|
| 09-11-T3 | 09-11 | 8 | ADMIN-05 | T-09-18, T-09-19 | Settings and navigation stay permission-filtered | unit + PostgreSQL | `go test ./cabana -run '^TestPhase09PermissionMatrix$' -count=1 && (cd ../fonoteka.go && go test ./plugins/golem15/fonoteka -run '^TestAdminSettings' -count=1)` | yes | green |
|
|
| 09-12-T1 | 09-12 | 9 | AUTH-08, ADMIN-01, ADMIN-02, ADMIN-03, ADMIN-04, ADMIN-05 | T-09-01, T-09-02, T-09-03, T-09-07, T-09-09, T-09-10, T-09-13, T-09-16, T-09-19, T-09-20 | Route-derived security matrix and fresh migration rollback | unit + PostgreSQL | `go test ./bouncer ./lagoon ./cabana -run '^TestPhase09' -count=1 && (cd ../fonoteka.go && go test ./plugins/golem15/fonoteka -run '^TestPhase09Security' -count=1)` | yes | green |
|
|
| 09-12-T2 | 09-12 | 9 | AUTH-08, ADMIN-01, ADMIN-02, ADMIN-03, ADMIN-04, ADMIN-05 | T-09-20, T-09-21, T-09-SC | Fail-closed route, PostgreSQL, and OpenAPI gate | phase gate | `scripts/check-phase9.sh --self-test && scripts/check-phase9.sh --postgres && scripts/check-phase9.sh --openapi` | yes | green |
|
|
| 09-12-T3 | 09-12 | 9 | AUTH-08, ADMIN-01, ADMIN-02, ADMIN-03, ADMIN-04, ADMIN-05 | T-09-01 through T-09-21, T-09-SC | Threat and Nyquist evidence | phase gate | `scripts/check-phase9.sh --evidence` | yes | green |
|
|
|
|
*Status: ⬜ pending · ✅ green · ❌ red · ⚠️ flaky*
|
|
|
|
---
|
|
|
|
## Wave 0 Requirements
|
|
|
|
- [x] Framework schema compiler tests are assigned to 09-03 and expanded by controller plans.
|
|
- [x] Backend guard tests are assigned to 09-01/09-02 and swept by 09-12.
|
|
- [x] The assembled raw-route authorization matrix is assigned to 09-12.
|
|
- [x] Real-PostgreSQL bulk, relation, scoping, settings, migration, rollback, and concurrency tests are assigned to 09-05/09-10/09-11/09-12.
|
|
- [x] Focused test names and commands are concrete in every PLAN task; no separate pre-execution scaffold is required.
|
|
|
|
---
|
|
|
|
## Manual-Only Verifications
|
|
|
|
All Phase 9 backend behaviors are expected to have automated verification. Phase 10 owns browser rendering and interaction UAT for the generated schemas.
|
|
|
|
---
|
|
|
|
## Validation Sign-Off
|
|
|
|
- [x] All tasks have `<automated>` verification and an immediate observable failure direction.
|
|
- [x] Sampling continuity: every task has automated verification.
|
|
- [x] All previously missing references are assigned to owning TDD tasks and the final gate.
|
|
- [x] No watch-mode flags appear in validation commands.
|
|
- [x] Focused task-level commands target the 60-second feedback budget; multi-minute PostgreSQL/full-suite checks are phase gates.
|
|
- [x] `nyquist_compliant: true` is set after final plan/task IDs and commands are validated.
|
|
|
|
**Approval:** approved for execution. Plan 09-12 recorded the gate results on 2026-09-27.
|