# Phase 12.1 deferred items
|
|
|
|
## Deferred Items
|
|
|
|
- Two inventory tests of the application's fonoteka plugin module fail against the framework at v0.1.3
|
|
status: open
|
|
**Found:** plan 12.1-02 Task 6, 2026-10-05, by running `go -C ../fonoteka.go/plugins/golem15/fonoteka test ./... -count=1` in addition to the plan's gate.
|
|
**What:** `TestPhase09SecurityRoutes` (`admin_phase09_security_test.go`) reports the two plan 01 routes `POST .../{controller}/bulk/{action}` and `POST .../{controller}/{id}/actions/{action}` as unexpected, because the fixed list `phase09AdminRoutes` does not name them. `TestPhase10ControllerCopy` (`admin_phase10_copy_test.go`) compares the list messages with the fixed list `phase10ListMessageKeys`, which lacks `rowStateDeleted`, `rowStateNegative` and `rowStateDisabled`; its form half was not reached and may need `preview` and `edit` the same way.
|
|
**Why not fixed here:** the fix is two fixed lists in the application repository (fonoteka.go); plan 12.1-02 writes to summercms.go only. No framework change is needed, so the tagged commit is not affected. The same catch-up was done once before (`549840d test(13-06): list the Phase 12.2 cabana admin routes in the Phase 9 route inventory`).
|
|
**Why the gate missed it:** the plan's application gate `go -C ../fonoteka.go test ./... -count=1` runs the root module only; the go.work plugin modules (`plugins/golem15/{user,fonoteka,golem,feedback}`) are separate modules and are not matched by `./...`.
|
|
**Suggested owner:** plan 12.1-04 (it already writes the application's parity allow-list entry and submodule pointer) or plan 12.1-05's gate script, which should run every workspace module.
|