The validation contract is signed off and the phase plan count is 6/6. Requirement checkboxes stay open while the user-api routes are still pending. Co-authored-by: Cursor <cursoragent@cursor.com>
116 lines
5.3 KiB
Markdown
116 lines
5.3 KiB
Markdown
---
|
|
phase: 07-user-plugin-and-authentication
|
|
plan: 06
|
|
subsystem: testing
|
|
tags: [bouncer, jwt, fonoteka, parity, race]
|
|
|
|
requires:
|
|
- phase: 07-user-plugin-and-authentication
|
|
provides: session, account, token, and locale handlers plus the recorded user-api corpus
|
|
provides:
|
|
- mint/refresh/blacklist round-trip and concurrent blacklist tests
|
|
- in-process register-to-logout sequence and per-scope token mints
|
|
- signed-off 07-VALIDATION.md
|
|
affects: [phase-7-verification]
|
|
|
|
tech-stack:
|
|
added: []
|
|
patterns: [phase gate is go test -race in both modules, including nested plugin modules]
|
|
|
|
key-files:
|
|
created:
|
|
- bouncer/phase07_coverage_test.go
|
|
- ../fonoteka.go/plugins/golem15/user/sequence_test.go
|
|
modified:
|
|
- .planning/phases/07-user-plugin-and-authentication/07-VALIDATION.md
|
|
- ../fonoteka.go/parity/schema_diff_test.go
|
|
|
|
key-decisions:
|
|
- "user_throttle and jwt_blacklist are named allowed diffs against the frozen PHP schema snapshot"
|
|
- "AUTH-01 through AUTH-04 and I18N-02 stay unchecked; user-api routes stay pending"
|
|
|
|
patterns-established:
|
|
- "Pattern: nested plugin modules are tested with explicit ./plugins/golem15/... paths"
|
|
|
|
requirements-completed: []
|
|
|
|
duration: 40min
|
|
completed: 2026-09-22
|
|
---
|
|
|
|
# Phase 7 Plan 06: Unit coverage Summary
|
|
|
|
**Phase 7's session, token, and blacklist paths have direct tests, and `go test -race` is green in both modules.**
|
|
|
|
## Performance
|
|
|
|
- **Duration:** 40 min
|
|
- **Started:** 2026-09-22T16:50:00Z
|
|
- **Completed:** 2026-09-22T17:20:32Z
|
|
- **Tasks:** 3
|
|
- **Files modified:** 8
|
|
|
|
## Accomplishments
|
|
|
|
- Mint, verify, refresh, and blacklist round-trip, plus concurrent Memory and Postgres blacklist calls, pass under `-race`.
|
|
- `TestSessionSequence` walks register, fetch, update, change-password, refresh, logout, and a 401 on the logged-out token. Token mint covers `read`, `write`, `ai`, and `read+write`.
|
|
- `07-VALIDATION.md` task IDs are filled, Wave 0 and sign-off boxes are checked, and `nyquist_compliant` is true.
|
|
- Corpus inventory stays recorded 169, ported 7, pending 162, failing 0. `TestParityCorpus` passes.
|
|
|
|
## Task Commits
|
|
|
|
1. **Task 1: Framework blacklist coverage** — `4754377` in `summercms.go`
|
|
2. **Task 2: Session sequence and token scopes** — `a9f3531` in `fonoteka.go` (lock and deferred-route tests already in `9e5a125`)
|
|
3. **Task 3: Validation sign-off** — this docs commit
|
|
|
|
## Files Created/Modified
|
|
|
|
- `bouncer/phase07_coverage_test.go` — round-trip and concurrent blacklist tests
|
|
- `plugins/golem15/user/sequence_test.go` — register through logout
|
|
- `plugins/golem15/fonoteka/token_locale_test.go` — one mint per allowed scope set
|
|
- `parity/schema_diff_test.go` — allowed extra tables for the user plugin
|
|
- `parity/migrate_test.go` — user history is five migrations
|
|
- `07-VALIDATION.md` — task IDs and green statuses
|
|
|
|
## Decisions Made
|
|
|
|
The frozen PHP schema snapshot predates the user plugin. `user_throttle` and `jwt_blacklist` are allowed extra Go tables, with the reason written on the diff entry. `jwt_blacklist` is Go-only: PHP logout does not blacklist, and the recorded fetch-after-logout stays 200.
|
|
|
|
Requirement checkboxes stay open. The user-api routes are still pending, and authenticated activate with a wrong code is still an HTML 500 in PHP while Go returns 200.
|
|
|
|
## Deviations from Plan
|
|
|
|
### Auto-fixed Issues
|
|
|
|
**1. [Rule 1 - Bug] Schema and migration tests still described the pre-phase-7 user plugin**
|
|
- **Found during:** Task 3 (full `go test -race`)
|
|
- **Issue:** `TestSchemaMatchesPHPSnapshot` rejected `user_throttle` and `jwt_blacklist`. Migration status expected 2 user migrations; there are 5. `TestHiddenNeverMarshals` expected 2 user models; Throttle makes 3. `TestGenreSecurityBoundaries` booted without `http.body_limits`.
|
|
- **Fix:** Named the two tables in `allowedDiffs`, expected 5 user migrations and 3 user models, and set the body-limit keys on that test config.
|
|
- **Files modified:** `parity/schema_diff_test.go`, `parity/migrate_test.go`, `plugins/golem15/fonoteka/classes/hidden_marshal_test.go`, `parity/genre_security_test.go`
|
|
- **Verification:** `go test ./... -race` and the nested plugin packages passed
|
|
- **Committed in:** `280ff56`
|
|
|
|
---
|
|
|
|
**Total deviations:** 1 auto-fixed
|
|
**Impact on plan:** The gate was red on counts the phase itself had already shipped. No production code changed.
|
|
|
|
## Issues Encountered
|
|
|
|
`summer parity:replay` requires `--target` and `--fixtures`. The in-process gate is `go test ./parity/ -run TestParityCorpus`, which reports passing 7, failing 0, pending 162. Pending user-api fixtures are loaded and not sent to the Go handler.
|
|
|
|
## User Setup Required
|
|
|
|
None - no external service configuration required.
|
|
|
|
## Next Phase Readiness
|
|
|
|
Phase 7 plans are done and ready for verification. AUTH-01, AUTH-02, AUTH-03, AUTH-04, and I18N-02 stay unchecked until that sign-off. The activate HTML 500 and fetch-after-logout 200 gaps stay recorded, not patched.
|
|
|
|
## Self-Check: PASSED
|
|
|
|
- `go vet ./... && go test ./... -race` passed in `summercms.go`.
|
|
- `go vet ./... && go test ./... -race` passed in `fonoteka.go`, including `./plugins/golem15/user`, `./plugins/golem15/fonoteka`, and `./plugins/golem15/fonoteka/...`.
|
|
- `TestParityCorpus` inventory is recorded 169, ported 7, pending 162, failing 0.
|
|
- Commits `4754377`, `a9f3531`, and `280ff56` are on master. `go.work.sum` is untracked and not committed.
|