gsd_state_version: 1.0
milestone: v1.0
milestone_name: milestone
status: ready_to_plan
stopped_at: Phase 01 complete (4/4) — ready to discuss Phase 02
last_updated: 2026-09-16T12:44:56.877Z
last_activity: 2026-09-16 -- Phase 01 execution started
progress:
total_phases: 15
completed_phases: 1
total_plans: 4
completed_plans: 4
percent: 7
---
# Project State
## Project Reference
See: .planning/PROJECT.md (updated 2026-09-16)
**Core value:** An existing WinterCMS-shaped app can be ported plugin by plugin to a single Go binary without its frontend noticing: the PHP version's API contract is the acceptance test.
**Current focus:** Phase 02 — api parity harness bootstrap
## Current Position
Phase: 02
Plan: Not started
Status: Ready to plan
Last activity: 2026-09-16
Progress: [█░░░░░░░░░] 7%
## Performance Metrics
**Velocity:**
- Total plans completed: 4
- Average duration: -
- Total execution time: 0 hours
**By Phase:**
| Phase | Plans | Total | Avg/Plan |
|-------|-------|-------|----------|
| 01 | 4 | - | - |
**Recent Trend:**
- Last 5 plans: -
- Trend: -
*Updated after each plan completion*
## Accumulated Context
### Roadmap Evolution
- Phase 2 edited: edited fields: depends_on (Phase 1), goal (summer parity:* on bonfire, no longer a parallel workstream)
### Decisions
Decisions are logged in PROJECT.md Key Decisions table.
Recent decisions affecting current work:
- Roadmap: gormigrate (not goose) is the migration tool, per STACK.md's more recent reasoning — ARCHITECTURE.md/PITFALLS.md text still says goose in places; treat gormigrate as authoritative when phases 3 and 5 are planned.
- Roadmap: two repos from day one — `summercms.go` (framework, no app knowledge) and `fonoteka.go` (sibling app repo, go.work workspace of plugins). Every phase states which repo(s) it writes to.
- Roadmap: the parity harness (Phase 2) and the first vertical slice (Phase 3) are sequenced immediately after kernel foundation, ahead of any further kernel broadening, to avoid the documented Scala-era bottom-up-kernel failure mode.
### Pending Todos
None yet.
### Blockers/Concerns
- Phase 8 (OAuth2.1) needs a pre-planning check of `wavepath.org/plugins/golem15/oauthserver` to resolve whether `ClientCredentialsStorage`/`TokenExchangeStorage` are needed — flagged in research/SUMMARY.md Gaps, unresolved.
- Phase 9 (admin schema pipeline / relation manager) is the least-precedented design surface in the research — plan with `--research-phase`.
- Phase 11 (River dual-driver split) is documented but unverified against a real build — plan with `--research-phase` and budget a timed-latency test.
## Deferred Items
Items acknowledged and carried forward from previous milestone close:
| Category | Item | Status | Deferred At |
|----------|------|--------|-------------|
| *(none — first milestone)* | | | |
## Session Continuity
Last session: 2026-09-16T10:47:33.084Z
Stopped at: Phase 2 context gathered
Resume file: .planning/phases/02-api-parity-harness-bootstrap/02-CONTEXT.md