docs(16-01): complete gsd-plan-checker plan

Tasks completed: 2/2
- Create gsd-plan-checker agent with six verification dimensions
- Examples included for common failure modes

SUMMARY: .planning/phases/16-plan-verification-loop/16-01-SUMMARY.md

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
This commit is contained in:
Lex Christopherson
2026-01-16 08:58:01 -06:00
parent 47eab1a2b0
commit b838692c53
2 changed files with 113 additions and 8 deletions

View File

@@ -20,18 +20,18 @@
## Current Position
Phase: 16 of 16 (Plan Verification Loop)
Plan: 0 of 3 in current phase
Status: Planned
Last activity: 2026-01-16 - Phase 16 planned (3 plans in 2 waves)
Plan: 1 of 3 in current phase
Status: In progress
Last activity: 2026-01-16 - Completed 16-01-PLAN.md
Progress: ██████████████████████████████ 36/36 plans (100%)
Progress: █████████████████████████████████████ 37/39 plans (95%)
## Performance Metrics
**Velocity:**
- Total plans completed: 36
- Total plans completed: 37
- Average duration: 3.4 min
- Total execution time: ~122 min
- Total execution time: ~125 min
**By Phase:**
@@ -52,9 +52,10 @@ Progress: ███████████████████████
| 13 | 3 | 10 min | 3.3 min |
| 14 | 3 | 11 min | 3.7 min |
| 15 | 3 | 7 min | 2.3 min |
| 16 | 1 | 3 min | 3 min |
**Recent Trend:**
- Last 5 plans: 14-03 (3m), 15-01 (5m), 15-02 (3m), 15-03 (1m)
- Last 5 plans: 15-01 (5m), 15-02 (3m), 15-03 (1m), 16-01 (3m)
- Trend: Consistent execution times
*Updated after each plan completion*
@@ -92,6 +93,8 @@ Progress: ███████████████████████
| 15 | Deprecation notices point to specific agent sections | Planning references deprecated, content in gsd-planner |
| 15 | 189 lines thin orchestrator for /gsd:plan-phase | Under 200 target, uses agent: gsd-planner frontmatter |
| 15 | Context-only planner-subagent-prompt.md template | Follows debug/research template pattern |
| 16 | Six verification dimensions | Coverage, completeness, dependencies, links, scope, derivation |
| 16 | Checker verifies plans WILL achieve goal | Same methodology as verifier but applied to plans pre-execution |
### Deferred Issues
@@ -127,5 +130,5 @@ Drift notes: None
## Session Continuity
Last session: 2026-01-16
Stopped at: Completed 15-03-PLAN.md
Stopped at: Completed 16-01-PLAN.md
Resume file: None