Tom Boucher
8df5cb36c2
enhance( #2951 ): refuse [VERIFIED] for a compatibility claim resting on absent metadata ( #3718 )
...
* test(#2951 ): pin the absent-evidence provenance contract (failing first)
17 tests / 22 anchors on the deployed agent text. Measured against the parent
commit: 20 anchors fail, 2 pass. The two that pass are the sibling-integrity
guards on the package-name and in-repo-value rules -- green before and after is
their intended signature.
Refs #2951
* enhance(#2951 ): refuse [VERIFIED] for a compatibility claim resting on absent metadata
A claim of the form "X does not support Y" drawn from MISSING metadata -- no
python_requires, no engines field, no per-version classifier, no changelog entry,
no matching support-matrix row -- no longer earns [VERIFIED] however
authoritative the source consulted. An absence is silence about every value, so
the same evidence would "prove" both the version being ruled out and the version
being standardized on. The only route from an absence to [VERIFIED] is a positive
falsification attempt with its failing output pasted; everything short of that is
[ASSUMED], which the file already routes to "needs user confirmation before
becoming a locked decision".
Third member of the family beside the package-name and in-repo-value provenance
rules, mirroring PR #2768 's shape. A present declared constraint and an
affirmatively documented incompatibility are untouched.
Closes #2951
* fix(#2951 ): close the allow-list ambiguity and the mutation gap review found
Findings from the isolated adversarial pass and the two-axis review, all fixed:
MAJOR (x2, one root cause) -- the absence clause and the present-constraint
carve-out gave opposite verdicts on the same evidence for the commonest real
case: a classifier list enumerating :: 3.9 through :: 3.13 with no :: 3.14. A
researcher could read the enumerated list as a "declared" positive constraint
and re-earn [VERIFIED], which is also the evasion vector. The rule now states
the decision procedure -- does the declaration bound EVERY value or only the
ones it names -- and closes the positive-reframing restatement explicitly. New
contract test pins all four clauses.
MAJOR -- 'licenses a positive falsification attempt as the route to [VERIFIED]'
asserted two independent substrings and never that the route lands on
[VERIFIED]. A mutant swapping the tag for [CITED] or [ASSUMED] inverted the
rule and survived all 17 tests. Now pinned as one joined sentence.
MINOR -- the attributable-failure test regex-matched illustrative examples
("a missing certificate, a wrong host"), so a copy-edit would break it for no
reason; relaxed to the substantive clause. The no-paraphrase guard counted only
the heading, missing the drift mode in its own name; it now also pins the core
proposition to one occurrence, and the test name matches what it checks. An
off-by-one in the new allow-list regex bound (141 actual vs 140) is fixed.
MINOR -- docs/AGENTS.md listed four of the five governed absence forms while
the agent prose, docs/COMMANDS.md and the changeset listed five; three copies
disagreeing on list membership is the drift this repo treats as a defect.
SCOPE -- removed docs/how-to/verify-a-dependency-compatibility-claim.md and its
docs/README.md index line. Both reviewers flagged them as a seventh and eighth
surface beyond the six the requester capped, and CONTRIBUTING's "Agent or skill
change" row requires only docs/AGENTS.md. The actionable four-case guidance is
retained in docs/COMMANDS.md, which is inside the approved scope.
Ack byte figures corrected for the final size: 44250 -> 46602 (+2352), 2550
bytes headroom under the LARGE cap of 49152.
Refs #2951
* docs(#2951 ): restore the how-to the phase gate requires
Reverses the removal in 6404b43d3. Both /code-review axes had flagged
docs/how-to/verify-a-dependency-compatibility-claim.md and its docs/README.md
index line as a seventh and eighth surface beyond the six the requester capped,
and CONTRIBUTING.md's required-docs row for an "Agent or skill change" names
only docs/AGENTS.md, so they were dropped.
gsd-phase-gate.cjs then denied gh pr create: it refuses when the recorded
enablement sequence has more than one step and the how-to quadrant is empty.
The sequence here is genuinely four steps -- run plan-phase, read the [ASSUMED]
claim, probe or cite or accept it unlocked, then answer discuss-phase's
checkpoint -- and the last step lands on a different capability's surface, so a
reference table cannot carry it. Compressing the sequence to one step to unlock
howToSkipReason would be gaming the gate, which is the same Goodhart failure
this whole change exists to close.
A machine-enforced repo gate outranks two reviewers' scope preference and my own
reading, so the page is restored and the PR body discloses the two extra
surfaces instead of hiding them. Reverting is a one-file change if a maintainer
prefers the tighter scope.
Refs #2951
* chore(#2951 ): backfill the changeset PR number
pr: 0 -> 3718 now that the real PR exists. The placeholder fails
scripts/changeset/lint.cjs with fail_invalid_fragment, which also blocks
lint-docs-required from consuming the fragment.
Refs #2951
---------
Co-authored-by: sim <sim@local>
2026-08-20 14:35:14 -04:00
..
2026-06-25 18:24:39 -04:00
2026-08-20 14:35:14 -04:00
2026-08-19 16:41:27 -04:00
2026-08-19 21:55:18 -04:00
2026-08-19 01:33:40 -04:00
2026-06-25 18:24:39 -04:00
2026-08-18 07:26:28 -04:00
2026-07-09 23:43:18 -04:00
2026-06-15 23:21:20 -04:00
2026-06-02 18:35:29 -04:00
2026-08-18 11:37:44 -04:00
2026-07-06 08:31:51 -04:00
2026-07-17 06:50:06 -04:00
2026-08-11 22:23:55 -04:00
2026-06-13 21:07:55 -04:00
2026-06-13 21:07:55 -04:00
2026-06-13 21:07:55 -04:00
2026-08-07 21:03:50 -04:00
2026-08-09 14:23:35 -04:00
2026-06-14 10:45:42 -04:00
2026-08-05 17:20:56 -04:00
2026-08-19 21:55:18 -04:00
2026-07-13 09:02:44 -06:00
2026-08-14 19:02:14 -04:00
2026-06-02 18:35:29 -04:00
2026-06-02 18:35:29 -04:00
2026-06-21 22:55:22 -04:00
2026-06-13 23:35:08 -04:00
2026-08-14 10:02:28 -04:00
2026-08-17 17:25:53 -04:00
2026-08-07 15:18:18 -04:00
2026-08-14 10:02:28 -04:00
2026-08-13 23:10:52 -04:00
2026-08-12 20:45:00 -04:00
2026-08-10 09:48:26 -04:00
2026-08-04 18:10:31 -04:00
2026-08-14 16:03:48 -04:00
2026-08-14 13:10:49 -04:00
2026-04-25 10:50:54 -04:00
2026-07-01 20:09:01 -04:00
2026-08-08 05:50:49 -05:00
2026-06-12 19:51:54 -04:00
2026-06-11 23:59:56 -04:00
2026-06-06 11:24:48 -04:00
2026-06-02 18:35:29 -04:00
2026-07-30 12:48:06 -04:00
2026-07-30 12:48:06 -04:00
2026-08-07 15:18:18 -04:00
2026-08-13 16:19:57 -04:00
2026-08-06 23:57:05 -04:00
2026-08-14 13:10:49 -04:00
2026-07-03 09:17:32 -04:00
2026-08-08 05:50:17 -05:00
2026-06-27 08:43:47 -04:00
2026-08-14 10:02:28 -04:00
2026-08-15 17:00:52 -04:00
2026-06-02 18:35:29 -04:00
2026-08-18 09:23:44 -04:00
2026-08-07 15:18:18 -04:00
2026-08-13 20:31:55 -04:00
2026-08-14 10:02:28 -04:00
2026-08-14 23:01:30 -04:00
2026-06-10 16:10:07 -04:00
2026-08-14 10:02:28 -04:00
2026-08-14 10:02:28 -04:00
2026-08-03 19:59:58 -04:00
2026-06-15 18:11:20 -04:00
2026-07-24 22:49:29 -04:00
2026-08-03 12:39:16 -04:00
2026-08-07 03:14:40 -04:00
2026-08-07 21:03:50 -04:00
2026-08-10 12:55:52 -04:00
2026-08-07 15:18:18 -04:00
2026-06-18 23:37:43 -04:00
2026-08-18 22:35:54 -04:00
2026-06-09 22:35:42 -04:00
2026-08-07 15:18:18 -04:00
2026-08-14 21:34:29 -04:00
2026-08-12 08:25:14 -04:00
2026-06-26 12:44:09 -04:00
2026-07-03 19:37:14 -04:00
2026-06-16 02:38:47 -04:00
2026-08-19 16:41:27 -04:00
2026-08-14 21:34:29 -04:00
2026-08-08 05:50:17 -05:00
2026-08-14 21:34:29 -04:00
2026-08-07 15:18:18 -04:00
2026-07-03 09:17:32 -04:00
2026-08-07 15:45:51 -04:00
2026-08-07 15:45:51 -04:00
2026-08-10 12:55:52 -04:00
2026-06-14 15:02:54 -04:00
2026-07-21 19:32:51 -04:00
2026-05-01 18:12:20 -04:00
2026-08-09 12:27:04 -04:00
2026-08-16 12:59:08 -04:00
2026-08-13 16:19:57 -04:00
2026-08-14 01:10:48 -04:00
2026-08-19 13:51:40 -04:00
2026-07-05 14:04:29 -04:00
2026-08-08 05:50:17 -05:00
2026-08-14 09:27:48 -04:00
2026-08-07 21:03:50 -04:00
2026-08-18 14:11:23 -04:00
2026-08-05 23:22:59 -04:00
2026-08-07 15:18:18 -04:00
2026-08-05 23:22:59 -04:00
2026-08-08 16:05:17 -04:00
2026-07-28 18:02:17 -04:00
2026-08-14 19:02:14 -04:00
2026-06-12 16:03:51 -04:00
2026-07-26 01:06:35 -04:00
2026-07-26 20:49:38 -04:00
2026-08-14 09:28:22 -04:00
2026-08-14 13:10:49 -04:00
2026-06-02 18:35:29 -04:00
2026-08-07 21:03:50 -04:00
2026-07-09 19:38:27 -04:00
2026-07-09 19:38:27 -04:00
2026-08-05 17:20:56 -04:00
2026-08-18 09:23:44 -04:00
2026-07-09 19:38:27 -04:00
2026-05-29 11:39:52 -04:00
2026-08-10 10:18:29 -04:00
2026-08-11 22:23:55 -04:00
2026-08-07 21:03:50 -04:00
2026-07-20 08:22:23 -04:00
2026-06-13 23:35:08 -04:00
2026-08-13 16:19:57 -04:00
2026-06-06 11:24:48 -04:00
2026-08-19 22:45:35 -04:00
2026-08-14 00:26:07 -04:00
2026-08-03 19:59:58 -04:00
2026-08-14 23:01:00 -04:00
2026-07-29 19:49:53 -04:00
2026-08-14 10:02:28 -04:00
2026-08-14 13:10:49 -04:00
2026-08-18 09:23:44 -04:00
2026-07-11 09:39:34 -04:00
2026-08-10 01:31:15 -04:00
2026-08-19 18:38:13 -04:00
2026-08-18 09:23:44 -04:00
2026-08-10 02:11:57 -04:00
2026-07-03 08:59:23 -04:00
2026-08-15 23:29:30 -04:00
2026-08-14 10:02:28 -04:00
2026-08-18 00:25:32 -04:00
2026-08-17 21:59:40 -04:00
2026-08-07 15:18:18 -04:00
2026-08-17 13:34:55 -04:00
2026-08-07 21:03:50 -04:00
2026-08-14 19:02:14 -04:00
2026-08-18 07:26:28 -04:00
2026-08-08 16:05:17 -04:00
2026-08-09 19:52:47 -04:00
2026-08-14 13:10:49 -04:00
2026-08-14 13:10:49 -04:00
2026-08-14 10:02:28 -04:00
2026-08-07 21:03:50 -04:00
2026-08-15 01:56:37 -04:00
2026-08-18 22:08:52 -04:00
2026-08-14 19:02:14 -04:00
2026-08-08 05:50:17 -05:00
2026-07-05 17:15:48 -04:00
2026-08-01 01:34:05 -04:00
2026-07-31 23:03:13 -04:00
2026-07-31 23:03:13 -04:00
2026-08-14 16:03:48 -04:00
2026-07-31 15:44:19 -04:00
2026-07-31 13:17:01 -04:00
2026-07-31 13:17:01 -04:00
2026-08-08 16:05:17 -04:00
2026-06-14 08:25:41 -04:00
2026-06-02 18:35:29 -04:00
2026-08-12 20:45:04 -04:00
2026-07-27 19:55:37 -04:00
2026-07-29 17:06:04 -04:00
2026-07-29 17:06:04 -04:00
2026-08-18 09:23:44 -04:00
2026-08-14 10:02:28 -04:00
2026-08-15 07:02:33 -04:00
2026-06-22 23:43:22 -04:00
2026-08-14 13:10:49 -04:00
2026-06-13 23:35:08 -04:00
2026-08-18 09:23:44 -04:00
2026-07-09 00:21:28 -04:00
2026-08-18 09:23:44 -04:00
2026-08-13 16:19:57 -04:00
2026-08-18 09:23:44 -04:00
2026-08-05 17:20:56 -04:00
2026-07-30 12:48:06 -04:00
2026-08-18 14:11:23 -04:00
2026-08-14 11:26:08 -04:00
2026-08-05 17:20:56 -04:00
2026-07-18 14:42:29 -04:00
2026-07-18 00:39:28 -04:00
2026-07-21 18:38:51 -04:00
2026-07-18 13:42:58 -04:00
2026-07-18 15:46:42 -04:00
2026-07-18 07:55:28 -04:00
2026-07-18 19:01:04 -04:00
2026-08-14 21:34:29 -04:00
2026-08-14 10:02:28 -04:00
2026-08-17 17:25:53 -04:00
2026-08-07 15:18:18 -04:00
2026-08-07 15:18:18 -04:00
2026-08-07 15:18:18 -04:00
2026-08-07 15:18:18 -04:00
2026-08-10 12:55:52 -04:00
2026-07-19 22:44:08 -04:00
2026-07-13 07:03:47 -07:00
2026-07-29 17:06:04 -04:00
2026-08-14 13:10:49 -04:00
2026-08-14 10:02:28 -04:00
2026-08-14 15:57:25 -04:00
2026-08-12 00:51:19 -04:00
2026-07-03 10:22:11 -04:00
2026-08-13 16:19:57 -04:00
2026-07-31 21:20:46 -04:00
2026-08-07 21:03:50 -04:00
2026-08-05 18:28:04 -04:00
2026-08-14 16:03:48 -04:00
2026-08-20 13:36:00 -04:00
2026-08-07 21:03:50 -04:00
2026-08-14 01:44:54 -04:00
2026-08-14 10:02:28 -04:00
2026-08-19 17:56:04 -04:00
2026-08-07 15:18:18 -04:00
2026-08-13 16:19:57 -04:00
2026-08-07 15:18:18 -04:00
2026-08-01 16:00:14 -04:00
2026-08-16 01:14:26 -04:00
2026-08-07 15:45:51 -04:00
2026-08-07 15:18:18 -04:00
2026-08-08 14:22:10 -04:00
2026-08-08 14:22:10 -04:00
2026-08-09 19:35:34 -04:00
2026-08-13 16:19:57 -04:00
2026-08-14 19:02:14 -04:00
2026-07-26 16:28:56 -04:00
2026-07-26 16:28:56 -04:00
2026-06-24 17:16:13 -04:00
2026-06-24 17:16:13 -04:00
2026-06-13 21:07:55 -04:00
2026-08-14 10:02:28 -04:00
2026-08-01 14:24:05 -04:00
2026-07-03 09:17:32 -04:00
2026-08-14 23:01:30 -04:00
2026-08-14 10:02:28 -04:00
2026-08-07 10:58:34 -04:00
2026-08-07 21:03:50 -04:00
2026-08-17 17:25:53 -04:00
2026-08-19 20:50:12 -04:00
2026-08-14 16:03:48 -04:00
2026-08-09 23:05:41 -04:00
2026-06-28 12:00:43 -04:00
2026-06-28 12:25:02 -04:00
2026-06-14 12:23:07 -04:00
2026-08-05 16:00:52 -04:00
2026-06-02 18:35:29 -04:00
2026-07-08 12:57:49 +03:00
2026-08-18 16:40:17 -04:00
2026-08-05 16:44:07 -04:00
2026-07-20 14:59:30 -04:00
2026-08-11 17:42:41 -04:00
2026-08-01 21:27:33 -04:00
2026-06-13 21:07:55 -04:00
2026-06-20 01:59:03 -04:00
2026-06-12 23:43:07 -04:00
2026-06-02 18:35:29 -04:00
2026-08-07 21:03:50 -04:00
2026-06-02 18:35:29 -04:00
2026-07-29 17:06:04 -04:00
2026-08-09 23:41:44 -04:00
2026-08-07 21:03:50 -04:00
2026-07-27 16:50:12 -04:00
2026-08-15 07:02:33 -04:00
2026-08-14 23:00:10 -04:00
2026-08-14 01:10:48 -04:00
2026-08-03 12:16:56 -04:00
2026-08-03 12:16:56 -04:00
2026-08-14 10:02:28 -04:00
2026-08-07 15:18:18 -04:00
2026-08-14 10:02:28 -04:00
2026-08-17 15:56:46 -04:00
2026-08-07 15:45:51 -04:00
2026-08-03 19:59:58 -04:00
2026-07-11 23:24:42 -04:00
2026-08-07 15:18:18 -04:00
2026-08-07 21:03:50 -04:00
2026-07-22 00:27:35 -04:00
2026-08-16 01:14:26 -04:00
2026-08-11 23:35:44 -04:00
2026-08-07 15:45:51 -04:00
2026-07-03 08:59:23 -04:00
2026-07-05 14:50:01 -04:00
2026-08-01 21:36:48 -04:00
2026-08-07 15:45:51 -04:00
2026-08-06 02:56:07 -04:00
2026-08-14 13:10:49 -04:00
2026-08-18 14:11:23 -04:00
2026-08-19 09:00:39 -04:00
2026-06-28 14:27:43 -04:00
2026-08-10 11:59:51 -04:00
2026-08-14 10:02:28 -04:00
2026-06-02 18:35:29 -04:00
2026-08-14 10:02:28 -04:00
2026-07-13 11:33:32 -06:00
2026-08-20 00:35:01 -04:00
2026-08-20 00:35:01 -04:00
2026-07-03 08:59:23 -04:00
2026-07-03 12:18:25 -04:00
2026-08-07 10:58:34 -04:00
2026-08-14 10:02:28 -04:00
2026-07-02 18:08:42 -04:00
2026-06-25 18:24:39 -04:00
2026-08-17 15:56:46 -04:00
2026-08-14 02:46:16 -04:00
2026-08-05 21:39:53 -04:00
2026-08-08 05:58:35 -05:00
2026-08-16 02:09:39 -04:00
2026-07-09 20:47:35 -04:00
2026-08-05 17:20:56 -04:00
2026-08-18 09:23:44 -04:00
2026-06-28 11:44:36 -04:00
2026-04-04 14:29:03 -04:00
2026-08-10 19:02:34 -04:00
2026-08-18 09:23:44 -04:00
2026-08-10 19:02:34 -04:00
2026-07-04 13:32:51 -04:00
2026-08-12 20:45:08 -04:00
2026-08-10 09:48:26 -04:00
2026-06-02 18:35:29 -04:00
2026-08-14 10:02:28 -04:00
2026-08-14 10:02:28 -04:00
2026-08-07 10:09:18 -04:00
2026-08-10 15:24:39 -04:00
2026-08-17 18:24:49 -04:00
2026-06-24 17:07:23 -04:00
2026-08-14 21:19:35 -04:00
2026-08-14 10:02:28 -04:00
2026-08-16 02:48:24 -04:00
2026-08-18 09:23:44 -04:00
2026-07-08 21:42:11 -04:00
2026-07-03 10:22:11 -04:00
2026-08-18 09:23:44 -04:00
2026-08-18 09:23:44 -04:00
2026-08-10 15:50:55 -04:00
2026-06-02 18:35:29 -04:00
2026-08-18 09:23:44 -04:00
2026-08-18 09:23:44 -04:00
2026-08-10 15:50:55 -04:00
2026-08-07 13:41:21 -04:00
2026-08-01 21:00:23 -04:00
2026-08-07 15:18:18 -04:00
2026-07-21 08:26:47 -04:00
2026-08-07 13:41:21 -04:00
2026-06-09 12:51:15 -04:00
2026-06-06 11:24:48 -04:00
2026-08-14 13:10:49 -04:00
2026-08-14 23:48:39 -04:00
2026-08-18 09:23:44 -04:00
2026-08-11 17:42:41 -04:00
2026-06-16 00:12:54 -04:00
2026-08-05 18:28:04 -04:00
2026-08-05 18:28:04 -04:00
2026-08-13 02:56:12 -04:00
2026-08-13 02:56:12 -04:00
2026-08-10 15:24:39 -04:00
2026-06-02 18:35:29 -04:00
2026-08-18 14:11:23 -04:00
2026-06-07 20:35:43 -04:00
2026-06-13 16:13:00 -04:00
2026-07-18 12:20:32 -04:00
2026-08-07 15:18:18 -04:00
2026-08-07 15:18:18 -04:00
2026-08-01 21:19:49 -04:00
2026-07-28 18:31:40 -04:00
2026-07-11 00:53:34 -04:00
2026-07-28 18:31:40 -04:00
2026-08-05 01:06:39 -04:00
2026-06-06 22:16:20 +02:00
2026-06-07 01:27:12 +02:00
2026-08-16 01:14:26 -04:00
2026-08-14 13:10:49 -04:00
2026-06-02 18:35:29 -04:00
2026-08-14 13:10:49 -04:00
2026-08-15 00:33:31 -04:00
2026-08-10 19:02:34 -04:00
2026-08-07 15:45:51 -04:00
2026-06-01 22:43:49 -04:00
2026-08-10 12:55:52 -04:00
2026-08-13 11:31:16 -04:00
2026-08-18 14:11:23 -04:00
2026-08-07 15:45:51 -04:00
2026-08-13 11:31:16 -04:00
2026-08-07 15:45:51 -04:00
2026-08-07 15:45:51 -04:00
2026-06-18 08:50:22 -04:00
2026-08-07 15:45:51 -04:00
2026-08-19 15:21:15 -04:00
2026-06-22 00:59:41 -04:00
2026-06-22 00:59:41 -04:00
2026-08-08 05:50:49 -05:00
2026-08-04 22:41:01 -04:00
2026-08-14 13:10:49 -04:00
2026-06-11 14:11:50 -04:00
2026-06-12 21:24:09 -04:00
2026-07-07 15:11:12 -04:00
2026-08-17 22:28:05 -04:00
2026-06-16 00:12:54 -04:00
2026-07-03 19:37:14 -04:00
2026-08-07 15:18:18 -04:00
2026-08-18 07:26:28 -04:00
2026-08-14 10:02:28 -04:00
2026-06-21 14:37:18 -04:00
2026-08-07 15:18:18 -04:00
2026-08-11 23:55:11 -04:00
2026-07-31 13:17:01 -04:00
2026-08-17 14:51:00 -04:00
2026-08-09 17:08:46 -04:00
2026-08-05 13:30:55 -04:00
2026-08-05 13:30:55 -04:00
2026-08-05 13:30:55 -04:00
2026-07-28 18:02:01 -04:00
2026-08-14 23:01:15 -04:00
2026-07-20 16:52:34 -04:00
2026-06-02 18:35:29 -04:00
2026-08-18 07:26:28 -04:00
2026-06-15 18:11:20 -04:00
2026-08-14 03:04:09 -04:00
2026-08-05 18:22:14 -04:00
2026-06-25 18:24:39 -04:00
2026-08-08 19:06:13 -04:00
2026-08-13 23:47:23 -04:00
2026-08-14 21:06:01 -04:00
2026-06-28 11:27:44 -04:00
2026-06-30 22:21:18 -04:00
2026-06-11 13:36:23 -04:00
2026-07-17 06:48:04 -04:00
2026-08-19 12:35:45 -04:00
2026-07-03 08:59:23 -04:00
2026-08-18 09:23:44 -04:00
2026-07-07 21:22:48 -04:00
2026-07-22 00:27:35 -04:00
2026-08-20 13:42:43 -04:00
2026-06-25 21:49:22 -04:00
2026-07-30 08:52:56 -04:00
2026-05-06 21:51:38 -04:00
2026-05-06 21:51:38 -04:00
2026-06-02 18:35:29 -04:00
2026-08-13 20:31:55 -04:00
2026-08-03 19:59:58 -04:00
2026-06-01 22:43:49 -04:00
2026-06-02 18:35:29 -04:00
2026-08-14 02:47:24 -04:00
2026-08-11 17:10:28 -04:00
2026-06-25 18:24:39 -04:00
2026-08-13 20:27:48 -04:00
2026-07-05 16:43:26 -04:00
2026-07-03 09:17:32 -04:00
2026-06-25 18:24:39 -04:00
2026-07-30 15:26:43 -04:00
2026-08-14 10:02:28 -04:00
2026-08-12 20:08:35 -04:00
2026-06-25 15:26:23 -04:00
2026-08-18 16:40:17 -04:00
2026-08-14 10:02:28 -04:00
2026-08-13 16:19:57 -04:00
2026-08-07 15:18:18 -04:00
2026-06-25 16:25:48 -04:00
2026-07-11 23:24:42 -04:00
2026-06-25 21:49:22 -04:00
2026-08-08 16:05:17 -04:00
2026-08-05 01:06:39 -04:00
2026-07-19 15:43:48 -04:00
2026-08-16 01:14:26 -04:00
2026-08-05 17:20:56 -04:00
2026-08-14 15:57:25 -04:00
2026-08-08 05:56:22 -05:00
2026-07-30 15:27:52 -04:00
2026-08-14 13:10:49 -04:00
2026-06-02 18:35:29 -04:00
2026-08-11 23:55:11 -04:00
2026-08-14 12:20:43 -04:00
2026-06-05 17:58:48 -04:00
2026-06-05 17:58:48 -04:00
2026-04-06 15:13:23 -04:00
2026-06-25 18:24:39 -04:00
2026-08-13 16:19:57 -04:00
2026-08-14 10:02:28 -04:00
2026-08-18 09:23:44 -04:00
2026-04-16 17:15:29 -04:00
2026-08-14 14:34:36 -04:00
2026-08-07 21:03:50 -04:00
2026-06-15 18:11:20 -04:00
2026-07-08 10:25:28 -04:00
2026-08-10 20:51:40 -04:00
2026-06-22 12:33:13 -04:00
2026-06-12 19:51:54 -04:00
2026-08-14 19:02:14 -04:00
2026-06-13 21:07:55 -04:00
2026-08-03 19:59:58 -04:00
2026-07-28 18:02:17 -04:00
2026-08-14 13:10:49 -04:00
2026-08-14 13:10:49 -04:00
2026-07-26 21:42:50 -04:00
2026-08-13 16:19:57 -04:00
2026-08-15 07:02:33 -04:00
2026-07-13 20:36:14 -04:00
2026-08-11 22:23:55 -04:00
2026-08-13 02:28:49 -04:00
2026-08-18 16:39:17 -04:00
2026-07-03 01:55:48 -04:00
2026-08-07 13:41:21 -04:00
2026-08-14 12:08:21 -04:00
2026-07-11 21:07:38 -04:00
2026-07-22 16:05:41 -04:00
2026-04-04 14:29:03 -04:00
2026-06-02 18:35:29 -04:00
2026-08-09 10:35:27 -04:00
2026-08-08 01:20:55 -04:00
2026-08-14 10:02:28 -04:00
2026-06-02 18:35:29 -04:00
2026-08-19 12:04:24 -04:00
2026-07-03 09:17:32 -04:00
2026-08-14 09:27:48 -04:00
2026-08-14 10:02:28 -04:00
2026-08-14 10:02:28 -04:00
2026-07-26 14:29:02 -04:00
2026-08-15 23:29:30 -04:00
2026-06-02 18:35:29 -04:00
2026-08-20 13:42:43 -04:00
2026-08-20 13:42:43 -04:00
2026-08-14 11:04:55 -04:00
2026-08-10 12:56:38 -04:00
2026-08-12 22:54:30 -04:00
2026-08-17 15:56:46 -04:00
2026-08-17 14:51:00 -04:00
2026-06-25 14:37:10 -04:00
2026-08-03 19:59:58 -04:00
2026-08-14 10:02:28 -04:00
2026-08-05 17:20:56 -04:00
2026-08-10 12:56:38 -04:00
2026-06-09 23:50:41 -04:00
2026-06-25 18:24:39 -04:00
2026-06-11 13:36:47 -04:00
2026-06-25 23:55:58 -04:00
2026-07-08 21:42:11 -04:00
2026-08-15 07:02:33 -04:00
2026-08-09 21:38:53 -04:00
2026-08-09 18:29:16 -04:00
2026-08-14 23:01:30 -04:00
2026-08-09 23:41:44 -04:00
2026-06-21 10:44:48 -04:00
2026-07-02 11:55:53 -04:00
2026-08-09 23:41:44 -04:00
2026-08-13 16:19:57 -04:00
2026-08-08 05:50:17 -05:00
2026-07-03 01:55:48 -04:00
2026-08-03 19:59:58 -04:00
2026-08-14 10:02:28 -04:00
2026-06-15 22:48:48 -04:00
2026-08-07 21:03:50 -04:00
2026-08-05 17:20:56 -04:00
2026-08-05 17:20:56 -04:00
2026-08-14 13:10:49 -04:00
2026-08-05 17:20:56 -04:00
2026-08-13 21:22:03 -04:00
2026-08-14 13:10:49 -04:00
2026-08-07 21:03:50 -04:00
2026-07-31 02:30:50 -04:00
2026-08-05 17:20:56 -04:00
2026-07-31 23:03:13 -04:00
2026-06-02 18:35:29 -04:00
2026-06-06 11:24:48 -04:00
2026-06-02 18:35:29 -04:00
2026-08-19 08:59:37 -04:00
2026-06-02 18:35:29 -04:00
2026-08-07 15:18:18 -04:00
2026-08-07 10:58:34 -04:00
2026-08-14 16:03:48 -04:00
2026-08-03 19:59:58 -04:00
2026-08-14 13:10:49 -04:00
2026-07-10 15:44:19 -04:00
2026-06-25 21:16:47 -04:00
2026-07-10 15:44:19 -04:00
2026-04-04 14:29:03 -04:00
2026-08-05 01:06:39 -04:00
2026-08-05 01:06:39 -04:00
2026-08-05 01:06:39 -04:00
2026-08-14 10:02:28 -04:00
2026-08-14 10:02:28 -04:00
2026-08-07 10:58:34 -04:00
2026-08-20 13:42:43 -04:00
2026-08-09 19:52:47 -04:00
2026-07-29 07:00:35 -04:00
2026-07-31 08:11:57 -04:00
2026-07-31 08:11:57 -04:00
2026-07-21 23:23:45 -04:00
2026-06-25 18:24:39 -04:00
2026-07-19 14:33:19 -04:00
2026-08-07 15:18:18 -04:00
2026-05-26 22:46:09 -04:00
2026-05-29 10:54:49 -04:00
2026-08-07 21:03:50 -04:00
2026-08-16 12:59:08 -04:00
2026-08-04 13:23:44 -04:00
2026-08-14 15:57:25 -04:00
2026-08-08 05:50:17 -05:00
2026-06-25 23:55:58 -04:00
2026-08-09 21:38:53 -04:00
2026-08-09 21:38:53 -04:00
2026-06-25 18:24:39 -04:00
2026-08-20 14:35:14 -04:00
2026-06-13 23:35:08 -04:00
2026-06-13 23:35:08 -04:00
2026-06-05 17:58:48 -04:00
2026-06-13 23:35:08 -04:00
2026-06-05 17:58:48 -04:00
2026-06-18 07:44:52 -04:00
2026-08-05 17:20:56 -04:00
2026-08-11 22:23:55 -04:00
2026-08-03 19:59:58 -04:00
2026-08-03 12:05:45 -04:00
2026-08-13 16:19:57 -04:00
2026-08-14 02:53:19 -04:00
2026-06-02 18:35:29 -04:00
2026-06-02 18:35:29 -04:00
2026-08-14 13:10:49 -04:00
2026-08-12 08:25:14 -04:00
2026-08-14 10:02:28 -04:00
2026-08-19 08:59:37 -04:00
2026-08-14 02:34:29 -04:00
2026-07-30 08:52:56 -04:00
2026-06-26 23:35:04 -04:00
2026-06-26 23:35:04 -04:00
2026-07-29 07:31:32 -04:00
2026-08-10 20:51:40 -04:00
2026-07-30 08:52:56 -04:00
2026-08-07 15:45:51 -04:00
2026-08-09 22:25:42 -04:00
2026-08-11 17:42:41 -04:00
2026-07-29 11:21:49 -04:00
2026-08-14 01:44:54 -04:00
2026-05-06 21:51:38 -04:00
2026-08-17 16:50:24 -04:00
2026-06-30 20:43:25 -04:00
2026-08-07 15:18:18 -04:00
2026-08-15 07:02:33 -04:00
2026-08-05 17:20:56 -04:00
2026-08-08 05:50:17 -05:00
2026-08-08 16:05:17 -04:00
2026-06-21 20:40:13 -04:00
2026-08-17 17:25:53 -04:00
2026-07-17 06:50:06 -04:00
2026-08-18 09:23:44 -04:00
2026-08-09 22:25:42 -04:00
2026-08-17 17:25:53 -04:00
2026-08-01 16:00:14 -04:00
2026-08-14 19:02:14 -04:00
2026-08-18 09:23:44 -04:00
2026-07-22 00:27:35 -04:00
2026-08-14 15:57:25 -04:00
2026-08-07 18:53:25 -04:00
2026-07-03 08:59:23 -04:00
2026-07-06 08:31:51 -04:00
2026-08-13 16:19:57 -04:00
2026-08-14 10:02:28 -04:00
2026-06-02 18:35:29 -04:00
2026-06-24 17:03:01 -04:00
2026-05-26 18:56:00 -04:00
2026-07-02 21:45:35 -04:00
2026-06-25 18:24:39 -04:00
2026-08-10 13:45:20 -04:00
2026-08-03 19:59:58 -04:00
2026-08-03 19:59:58 -04:00
2026-08-03 19:59:58 -04:00
2026-08-03 19:59:58 -04:00
2026-07-13 00:47:15 -04:00
2026-08-05 17:20:56 -04:00
2026-08-14 10:02:28 -04:00
2026-08-15 13:53:18 -04:00
2026-08-14 10:02:28 -04:00
2026-08-15 17:00:52 -04:00
2026-07-03 09:17:32 -04:00
2026-07-03 08:59:23 -04:00
2026-08-14 10:02:28 -04:00
2026-06-14 20:52:56 -04:00
2026-08-18 09:23:44 -04:00
2026-08-15 00:02:37 -04:00
2026-08-15 00:02:37 -04:00
2026-08-14 21:19:35 -04:00
2026-08-18 16:40:17 -04:00
2026-07-13 15:36:17 -04:00
2026-08-11 22:23:55 -04:00
2026-08-12 08:25:14 -04:00
2026-08-17 15:24:24 -04:00
2026-08-07 15:45:51 -04:00
2026-08-14 10:02:28 -04:00
2026-08-07 15:45:51 -04:00
2026-07-15 19:18:28 -04:00
2026-08-12 20:46:12 -04:00
2026-08-12 20:46:12 -04:00
2026-08-03 19:59:58 -04:00
2026-07-31 10:20:17 -04:00
2026-08-07 21:03:50 -04:00
2026-08-14 13:10:49 -04:00
2026-08-18 09:23:44 -04:00
2026-08-05 16:00:52 -04:00
2026-07-17 18:29:28 -04:00
2026-08-17 14:06:09 -04:00
2026-08-09 22:49:39 -04:00
2026-06-28 11:44:36 -04:00
2026-07-03 01:55:48 -04:00
2026-08-14 10:02:28 -04:00
2026-08-06 23:57:05 -04:00
2026-08-14 16:04:09 -04:00
2026-08-14 23:43:56 -04:00
2026-08-19 11:25:24 -04:00
2026-07-03 01:55:48 -04:00
2026-08-17 11:39:01 -04:00
2026-08-03 19:59:58 -04:00
2026-08-14 10:24:05 -04:00
2026-07-05 18:01:28 -04:00
2026-07-12 01:32:12 -04:00
2026-06-12 13:29:45 -04:00
2026-08-13 16:17:10 -04:00
2026-07-14 14:25:44 -04:00
2026-06-13 21:07:55 -04:00
2026-06-17 08:52:23 -04:00
2026-06-15 18:11:20 -04:00
2026-08-14 11:22:51 -04:00
2026-05-29 11:39:52 -04:00
2026-05-26 11:23:29 -04:00
2026-08-13 21:22:03 -04:00
2026-08-07 15:18:18 -04:00
2026-08-13 20:27:48 -04:00
2026-06-06 11:24:48 -04:00
2026-06-20 13:36:57 -04:00
2026-08-14 13:10:49 -04:00
2026-07-24 21:36:33 -04:00
2026-08-13 23:08:34 -04:00
2026-07-15 09:41:36 -04:00
2026-08-14 10:02:28 -04:00
2026-07-10 21:31:10 -04:00
2026-06-24 13:19:10 -04:00
2026-08-01 16:00:14 -04:00
2026-08-07 15:45:51 -04:00
2026-08-15 07:02:33 -04:00
2026-08-15 07:02:33 -04:00
2026-07-08 12:57:49 +03:00
2026-08-05 17:20:56 -04:00
2026-07-28 18:31:47 -04:00
2026-06-30 10:52:30 -04:00
2026-08-14 09:27:48 -04:00
2026-06-02 18:35:29 -04:00
2026-08-15 21:09:05 -04:00
2026-08-15 21:09:05 -04:00
2026-06-24 17:07:23 -04:00
2026-08-13 01:10:53 -04:00
2026-08-12 00:51:19 -04:00
2026-08-14 10:02:28 -04:00
2026-08-14 10:02:28 -04:00
2026-08-17 17:25:53 -04:00
2026-05-15 19:32:02 -04:00
2026-08-07 15:45:51 -04:00
2026-06-02 18:35:29 -04:00
2026-08-15 07:02:33 -04:00
2026-08-16 14:14:27 -04:00
2026-08-13 21:22:03 -04:00
2026-08-13 21:22:03 -04:00
2026-06-02 18:35:29 -04:00
2026-06-07 00:46:27 -04:00
2026-08-19 15:21:15 -04:00
2026-08-17 15:56:46 -04:00
2026-08-13 21:22:03 -04:00
2026-06-02 19:25:25 -04:00
2026-08-13 21:22:03 -04:00
2026-08-03 19:59:58 -04:00
2026-08-19 19:53:45 -04:00
2026-07-11 23:24:42 -04:00
2026-08-10 11:59:51 -04:00
2026-07-11 23:24:42 -04:00
2026-08-10 11:59:51 -04:00
2026-08-10 11:59:51 -04:00
2026-08-13 21:22:03 -04:00
2026-08-18 09:23:44 -04:00
2026-08-07 15:18:18 -04:00
2026-06-07 12:24:04 -04:00
2026-07-21 18:38:51 -04:00
2026-08-16 01:14:26 -04:00
2026-08-01 12:12:20 -04:00
2026-08-14 10:02:28 -04:00
2026-08-18 09:23:44 -04:00
2026-08-14 21:19:35 -04:00
2026-08-11 22:23:55 -04:00
2026-08-09 21:38:53 -04:00
2026-08-05 17:20:56 -04:00
2026-08-14 11:42:22 -04:00
2026-06-11 23:59:56 -04:00
2026-07-05 14:38:24 -04:00
2026-08-14 10:02:28 -04:00
2026-08-15 07:02:33 -04:00
2026-08-13 16:19:57 -04:00
2026-08-18 11:37:44 -04:00
2026-08-11 22:23:55 -04:00
2026-08-07 15:18:18 -04:00
2026-08-14 10:02:28 -04:00
2026-08-07 15:18:18 -04:00
2026-08-14 10:02:28 -04:00
2026-08-14 10:02:28 -04:00
2026-07-13 20:39:58 -04:00
2026-08-14 11:49:01 -04:00