Tom Boucher
418b361a99
test(3595): filesystem fault-injection for platformWriteSync atomic-write seam ( #3634 )
...
* test(3595): filesystem fault-injection for platformWriteSync atomic-write seam
Per CONTRIBUTING.md §"QA Matrix Requirements / Filesystem writes and
installers", adds adversarial coverage against the canonical write
seam every CJS config/state/generated-artifact writer routes through —
`platformWriteSync` in get-shit-done/bin/lib/shell-command-projection.cjs.
Fault matrix exercised via node:test mock.method() on real fs seams,
with t.after() restoring mocks so failures don't leak between tests:
- happy path baseline (atomicity + no orphan tmp file)
- renameSync EXDEV → fallback path writes directly, tmp cleaned up
- tmp writeFileSync ENOSPC → fallback writes directly
- both tmp and fallback fail → fallback error propagates (PINNED:
original cause is swallowed; open follow-up for .cause chaining)
- mkdirSync EACCES → escapes unhandled (PINNED current behavior)
- target path is an existing directory → typed errno code surfaces
AND the directory is preserved
- paths with spaces / Unicode / tabs / newlines (POSIX only for \n)
- 25 sequential writes leave 0 tmp orphans (cleanup invariant)
- platformEnsureDir is idempotent (no EEXIST throw)
- platformEnsureDir EACCES propagates
Symlink-safety invariants (security-critical):
- REPLACES a symlink with a regular file rather than following it —
a planted symlink in .planning/ pointing at ~/.ssh/authorized_keys
is NOT clobbered. Test pins this so a future refactor to
fs.writeFileSync (which follows symlinks) is a visible regression.
- Broken symlinks are replaced with the intended regular file.
Concurrent-write collision: a renameSync EBUSY on the in-flight write
must still produce a parseable, complete final file via the fallback —
never a half-written corruption.
13 new tests; total 192/192 pass when bundled with the pre-existing
state/config/worktree-safety suites (179 of theirs). Zero production
code changes — test-only PR.
Two known-open gaps deliberately NOT fixed in this PR (warrant separate
focused issues):
- platformWriteSync fallback path swallows the original tmp-write
error. Operator only sees the fallback's error when both fail.
- platformWriteSync mkdirSync(dirname, recursive:true) error
escapes without context — no message-wrapping or typed reason.
Closes #3595
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
* test(3595): use t.skip() for Win32 symlink gates + fix rename mock delegation
Two Codex review findings addressed:
1. Symlink tests previously used `if (process.platform === 'win32') return`
which CI reports as PASS even though the test ran zero assertions.
Replaced with `t.skip('symlinks on Win32 need admin'); return;` so
CI correctly reports SKIPPED on Windows lanes. Applied to both the
symlink-replace and broken-symlink tests.
2. The concurrent-collision test's rename mock referenced a
non-existent `fs.renameSync.wrapped` property in its fallback
branch — that path would silently no-op instead of delegating to
the real renameSync. Capture the real `fs.renameSync` BEFORE
installing the mock and call `originalRename.call(fs, src, dest)`
in the fallback branch, matching the ENOSPC test's pattern.
Codex review on PR #3634 .
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
---------
Co-authored-by: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-16 00:40:34 -04:00
..
2026-05-16 00:23:27 -04:00
2026-05-15 23:57:38 -04:00
2026-05-09 00:15:04 -04:00
2026-05-11 23:01:34 -04:00
2026-04-25 10:50:54 -04:00
2026-04-04 14:29:03 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-04-25 10:50:54 -04:00
2026-04-11 03:39:29 -07:00
2026-04-20 09:31:34 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-13 19:34:23 -04:00
2026-05-01 19:50:10 -04:00
2026-04-04 14:29:03 -04:00
2026-04-25 10:50:54 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-04-04 07:24:31 -04:00
2026-04-11 08:50:44 -04:00
2026-04-07 08:13:52 -04:00
2026-04-05 17:49:20 -04:00
2026-05-02 11:45:33 -04:00
2026-04-05 18:05:32 -04:00
2026-05-08 21:25:37 -04:00
2026-04-19 16:35:32 -05:00
2026-04-25 11:34:55 -04:00
2026-05-12 19:02:18 -04:00
2026-04-07 17:19:10 -04:00
2026-05-01 19:50:10 -04:00
2026-04-10 10:48:00 -04:00
2026-05-01 19:50:10 -04:00
2026-04-11 03:37:34 -07:00
2026-04-10 10:50:17 -04:00
2026-04-10 11:19:32 -04:00
2026-04-10 11:25:55 -04:00
2026-04-10 11:15:59 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-06 15:42:46 -04:00
2026-04-15 14:58:41 -04:00
2026-04-23 11:58:06 -04:00
2026-04-17 09:20:26 -04:00
2026-05-04 23:18:41 -04:00
2026-04-22 10:41:58 -04:00
2026-04-25 12:02:58 -04:00
2026-04-17 09:20:42 -04:00
2026-04-29 07:56:51 -04:00
2026-04-20 18:37:42 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-04-20 10:09:33 -04:00
2026-05-11 15:27:35 -04:00
2026-05-01 19:50:10 -04:00
2026-04-30 00:43:47 -04:00
2026-05-01 19:50:10 -04:00
2026-04-20 10:11:00 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-04-20 10:08:46 -04:00
2026-05-01 19:50:10 -04:00
2026-05-15 00:02:56 -04:00
2026-04-21 09:46:01 -04:00
2026-05-01 19:50:10 -04:00
2026-04-21 21:20:27 -04:00
2026-04-21 10:10:10 -04:00
2026-05-01 19:50:10 -04:00
2026-04-22 12:09:12 -04:00
2026-04-22 10:41:58 -04:00
2026-04-21 20:33:43 -04:00
2026-05-03 16:31:48 -04:00
2026-04-21 21:18:58 -04:00
2026-05-06 15:19:34 -04:00
2026-05-12 21:53:24 -04:00
2026-04-22 12:04:17 -04:00
2026-05-01 19:50:10 -04:00
2026-04-22 12:03:56 -04:00
2026-05-12 19:02:18 -04:00
2026-05-01 19:50:10 -04:00
2026-04-25 12:09:27 -04:00
2026-04-24 18:05:10 -04:00
2026-04-24 18:10:45 -04:00
2026-04-24 18:05:33 -04:00
2026-04-29 22:56:59 -04:00
2026-05-09 14:21:42 -04:00
2026-05-02 09:27:23 -04:00
2026-04-24 20:22:17 -04:00
2026-04-24 20:22:29 -04:00
2026-05-01 19:50:10 -04:00
2026-04-25 12:10:01 -04:00
2026-04-25 12:16:04 -04:00
2026-04-25 12:10:01 -04:00
2026-04-25 12:15:39 -04:00
2026-05-02 09:27:23 -04:00
2026-05-14 13:52:55 -04:00
2026-05-14 13:17:39 -04:00
2026-04-27 12:31:43 -04:00
2026-04-27 12:31:49 -04:00
2026-05-01 19:50:10 -04:00
2026-05-11 14:36:14 -04:00
2026-05-01 19:50:10 -04:00
2026-04-27 12:31:26 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-04-28 20:37:47 -04:00
2026-04-28 20:22:59 -04:00
2026-04-28 20:23:32 -04:00
2026-04-28 20:16:27 -04:00
2026-05-02 09:27:23 -04:00
2026-04-28 20:21:44 -04:00
2026-04-29 21:52:20 -04:00
2026-04-28 20:21:48 -04:00
2026-04-28 20:23:29 -04:00
2026-05-01 19:50:10 -04:00
2026-04-29 07:59:30 -04:00
2026-05-01 19:50:10 -04:00
2026-05-15 22:02:55 -04:00
2026-05-02 09:27:23 -04:00
2026-04-29 07:56:32 -04:00
2026-04-29 21:52:20 -04:00
2026-04-29 21:51:58 -04:00
2026-04-29 23:27:27 -04:00
2026-04-30 17:30:19 -04:00
2026-04-30 21:08:26 -04:00
2026-04-30 21:57:27 -04:00
2026-05-01 09:23:02 -04:00
2026-05-01 09:22:13 -04:00
2026-05-02 09:27:23 -04:00
2026-05-12 21:53:24 -04:00
2026-05-12 21:53:24 -04:00
2026-05-15 22:02:55 -04:00
2026-05-15 22:02:55 -04:00
2026-05-01 13:04:39 -04:00
2026-05-01 16:10:30 -04:00
2026-05-01 17:25:20 -04:00
2026-05-01 15:15:20 -04:00
2026-05-01 15:15:20 -04:00
2026-05-02 00:29:34 -04:00
2026-05-02 00:29:45 -04:00
2026-05-12 17:32:50 -04:00
2026-05-15 22:43:21 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 17:25:20 -04:00
2026-05-01 21:13:25 -04:00
2026-05-01 17:39:35 -04:00
2026-05-02 00:29:43 -04:00
2026-05-02 00:29:31 -04:00
2026-05-02 00:29:34 -04:00
2026-05-02 00:29:34 -04:00
2026-05-01 21:14:14 -04:00
2026-05-02 09:30:58 -04:00
2026-05-12 18:16:36 -04:00
2026-05-02 11:45:36 -04:00
2026-05-02 11:45:33 -04:00
2026-05-02 11:45:39 -04:00
2026-05-11 14:36:14 -04:00
2026-05-02 17:44:52 -04:00
2026-05-04 22:06:22 -04:00
2026-05-04 23:34:57 -04:00
2026-05-04 23:30:35 -04:00
2026-05-04 23:28:52 -04:00
2026-05-04 22:52:30 -04:00
2026-05-14 12:06:36 -04:00
2026-05-05 15:02:03 -04:00
2026-05-04 23:18:41 -04:00
2026-05-05 15:02:23 -04:00
2026-05-05 15:02:26 -04:00
2026-05-05 15:02:19 -04:00
2026-05-05 15:02:11 -04:00
2026-05-05 15:02:30 -04:00
2026-05-09 11:39:31 -04:00
2026-05-05 15:02:15 -04:00
2026-05-05 15:01:59 -04:00
2026-05-05 15:02:38 -04:00
2026-05-05 18:53:35 -04:00
2026-05-06 21:51:38 -04:00
2026-05-06 21:51:38 -04:00
2026-05-06 15:38:53 -04:00
2026-05-06 11:56:27 -04:00
2026-05-06 15:00:08 -04:00
2026-05-06 22:06:56 -04:00
2026-05-06 21:51:32 -04:00
2026-05-06 21:51:42 -04:00
2026-05-09 02:49:19 -04:00
2026-05-15 00:02:56 -04:00
2026-05-08 08:40:53 -04:00
2026-05-08 09:39:33 -04:00
2026-05-08 08:40:41 -04:00
2026-05-09 14:21:42 -04:00
2026-05-08 08:40:36 -04:00
2026-05-08 10:25:59 -04:00
2026-05-08 09:26:35 -04:00
2026-05-08 09:06:37 -04:00
2026-05-08 23:53:21 -04:00
2026-05-13 18:33:32 -04:00
2026-05-09 07:42:22 -04:00
2026-05-09 07:40:56 -04:00
2026-05-09 07:32:31 -04:00
2026-05-09 07:40:17 -04:00
2026-05-09 11:39:15 -04:00
2026-05-09 11:47:15 -04:00
2026-05-09 19:27:36 -04:00
2026-05-10 17:37:55 -04:00
2026-05-14 12:59:38 -04:00
2026-05-14 13:17:39 -04:00
2026-05-10 17:40:39 -04:00
2026-05-10 17:38:36 -04:00
2026-05-10 20:25:42 -04:00
2026-05-10 19:48:28 -04:00
2026-05-13 18:33:32 -04:00
2026-05-12 20:15:43 -04:00
2026-05-11 22:09:59 -04:00
2026-05-12 18:50:50 -04:00
2026-05-15 14:44:40 -04:00
2026-05-12 18:50:35 -04:00
2026-05-12 18:50:19 -04:00
2026-05-12 19:19:04 -04:00
2026-05-12 20:15:43 -04:00
2026-05-12 20:49:43 -04:00
2026-05-12 21:20:54 -04:00
2026-05-13 13:54:30 -04:00
2026-05-14 07:47:18 -04:00
2026-05-14 09:11:59 -04:00
2026-05-14 12:49:48 -04:00
2026-05-14 19:00:32 -04:00
2026-05-14 17:40:45 -04:00
2026-05-14 19:02:06 -04:00
2026-05-14 19:47:48 -04:00
2026-05-14 23:17:38 -04:00
2026-05-15 09:16:41 -04:00
2026-05-15 08:16:26 -04:00
2026-05-15 14:44:40 -04:00
2026-05-15 14:54:58 -04:00
2026-05-15 22:03:03 -04:00
2026-05-15 22:56:32 -04:00
2026-05-15 19:42:48 -04:00
2026-05-15 19:52:17 -04:00
2026-05-15 22:08:28 -04:00
2026-05-15 22:28:49 -04:00
2026-05-15 22:20:34 -04:00
2026-05-15 22:23:46 -04:00
2026-05-15 21:54:03 -04:00
2026-05-15 21:58:51 -04:00
2026-05-15 22:13:34 -04:00
2026-05-15 22:43:21 -04:00
2026-05-16 00:07:59 -04:00
2026-05-01 19:50:10 -04:00
2026-04-23 08:36:03 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 18:12:20 -04:00
2026-05-10 19:23:22 -04:00
2026-05-01 18:12:20 -04:00
2026-05-01 18:12:20 -04:00
2026-05-01 18:12:20 -04:00
2026-05-01 18:12:20 -04:00
2026-05-01 18:12:20 -04:00
2026-05-01 19:50:10 -04:00
2026-04-11 09:15:36 -04:00
2026-05-15 19:32:02 -04:00
2026-05-01 19:50:10 -04:00
2026-04-20 09:31:34 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-08 23:53:32 -04:00
2026-04-12 08:10:30 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-15 14:22:32 -04:00
2026-05-05 16:06:29 -04:00
2026-05-09 02:49:19 -04:00
2026-05-14 20:01:32 -04:00
2026-04-05 17:02:20 -04:00
2026-04-10 10:56:09 -04:00
2026-05-13 20:46:02 -04:00
2026-04-25 11:34:55 -04:00
2026-04-07 17:25:11 -04:00
2026-05-01 19:50:10 -04:00
2026-05-15 08:14:28 -04:00
2026-04-15 16:46:10 -04:00
2026-05-15 00:02:56 -04:00
2026-05-15 00:02:56 -04:00
2026-05-01 19:50:10 -04:00
2026-04-30 01:04:41 -04:00
2026-05-09 11:39:24 -04:00
2026-05-15 19:52:17 -04:00
2026-05-13 20:46:02 -04:00
2026-04-11 09:20:27 -04:00
2026-04-04 14:29:03 -04:00
2026-05-15 22:02:55 -04:00
2026-05-13 14:11:02 -04:00
2026-04-05 09:15:41 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-04-25 11:34:55 -04:00
2026-05-01 19:50:10 -04:00
2026-05-14 12:43:48 -04:00
2026-05-15 11:59:43 -04:00
2026-04-01 08:47:31 -06:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-04-25 16:26:15 -04:00
2026-05-05 15:44:59 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-06 21:51:29 -04:00
2026-04-25 14:23:40 -04:00
2026-04-22 12:04:21 -04:00
2026-04-29 08:14:11 -04:00
2026-05-05 10:51:10 -04:00
2026-05-09 02:49:19 -04:00
2026-04-30 00:48:49 -04:00
2026-05-14 16:38:05 -04:00
2026-05-06 11:59:53 -04:00
2026-05-11 23:01:34 -04:00
2026-05-09 11:46:28 -04:00
2026-05-06 21:51:38 -04:00
2026-05-01 19:50:10 -04:00
2026-05-10 19:48:28 -04:00
2026-05-15 22:02:55 -04:00
2026-05-01 19:50:10 -04:00
2026-05-06 21:51:38 -04:00
2026-05-01 19:50:10 -04:00
2026-05-05 16:06:29 -04:00
2026-04-22 20:49:52 -04:00
2026-05-12 21:53:24 -04:00
2026-05-02 23:12:50 -04:00
2026-05-02 13:19:15 -04:00
2026-05-02 14:26:35 -04:00
2026-05-02 15:24:26 -04:00
2026-05-15 22:02:55 -04:00
2026-05-11 15:27:40 -04:00
2026-05-15 00:02:56 -04:00
2026-05-13 21:19:47 -04:00
2026-05-15 20:22:11 -04:00
2026-05-09 11:46:34 -04:00
2026-05-09 11:39:31 -04:00
2026-05-09 23:29:11 -04:00
2026-05-09 13:54:06 -04:00
2026-05-15 11:59:43 -04:00
2026-05-15 11:59:43 -04:00
2026-05-15 23:57:38 -04:00
2026-05-15 23:57:38 -04:00
2026-05-15 23:57:38 -04:00
2026-05-16 00:23:27 -04:00
2026-05-16 00:23:27 -04:00
2026-05-16 00:23:27 -04:00
2026-05-16 00:40:34 -04:00
2026-04-05 18:33:17 -04:00
2026-05-01 19:50:10 -04:00
2026-05-14 12:43:48 -04:00
2026-04-26 21:40:38 -04:00
2026-05-01 19:50:10 -04:00
2026-05-10 17:39:06 -04:00
2026-05-06 21:51:38 -04:00
2026-05-02 09:27:23 -04:00
2026-05-01 19:50:10 -04:00
2026-05-06 21:01:25 -04:00
2026-05-06 21:51:38 -04:00
2026-05-12 21:53:24 -04:00
2026-05-05 18:34:42 -04:00
2026-04-15 22:46:31 -04:00
2026-04-04 14:37:54 -04:00
2026-04-04 14:29:03 -04:00
2026-05-02 11:45:33 -04:00
2026-04-30 22:48:08 -04:00
2026-05-01 19:50:10 -04:00
2026-04-04 14:29:03 -04:00
2026-04-20 09:31:34 -04:00
2026-05-02 09:27:23 -04:00
2026-05-01 19:50:10 -04:00
2026-05-06 20:27:33 -04:00
2026-04-15 14:59:07 -04:00
2026-05-04 23:03:10 -04:00
2026-04-27 12:31:49 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-15 13:46:12 -04:00
2026-05-13 17:12:53 -04:00
2026-05-13 17:12:53 -04:00
2026-05-12 20:15:43 -04:00
2026-05-13 12:45:16 -04:00
2026-05-13 12:45:16 -04:00
2026-05-13 17:12:53 -04:00
2026-05-13 12:45:16 -04:00
2026-05-13 12:45:16 -04:00
2026-05-11 14:36:14 -04:00
2026-05-15 22:56:32 -04:00
2026-05-15 08:16:28 -04:00
2026-05-11 15:07:50 -04:00
2026-04-15 14:59:24 -04:00
2026-05-01 19:50:10 -04:00
2026-04-20 09:39:05 -04:00
2026-04-20 09:39:05 -04:00
2026-05-01 19:50:10 -04:00
2026-04-26 13:33:54 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-04-05 19:09:14 -04:00
2026-05-15 20:00:29 -04:00
2026-05-13 12:45:16 -04:00
2026-04-30 11:38:13 -04:00
2026-04-14 17:57:38 -04:00
2026-05-01 19:50:10 -04:00
2026-04-04 14:29:03 -04:00
2026-05-01 19:50:10 -04:00
2026-04-25 11:34:55 -04:00
2026-05-01 19:50:10 -04:00
2026-05-15 19:32:02 -04:00
2026-04-26 11:48:47 -04:00
2026-05-09 00:15:04 -04:00
2026-05-08 21:25:37 -04:00
2026-04-30 22:48:08 -04:00
2026-05-06 21:51:38 -04:00
2026-05-06 21:51:38 -04:00
2026-05-06 21:51:38 -04:00
2026-04-05 18:05:32 -04:00
2026-05-06 21:51:38 -04:00
2026-04-07 08:13:46 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 16:10:30 -04:00
2026-05-01 19:50:10 -04:00
2026-05-09 00:15:04 -04:00
2026-05-01 19:50:10 -04:00
2026-05-08 09:08:06 -04:00
2026-04-06 15:13:23 -04:00
2026-05-01 19:50:10 -04:00
2026-05-14 10:21:11 -04:00
2026-04-16 17:15:29 -04:00
2026-04-04 14:29:03 -04:00
2026-04-11 15:02:55 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-11 21:13:07 -04:00
2026-04-30 14:10:28 -04:00
2026-04-04 14:29:03 -04:00
2026-04-25 12:02:58 -04:00
2026-05-06 21:51:38 -04:00
2026-05-01 19:50:10 -04:00
2026-05-15 00:02:56 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-06 21:51:38 -04:00
2026-04-30 11:38:13 -04:00
2026-05-01 19:50:10 -04:00
2026-04-30 12:13:55 -04:00
2026-05-11 22:45:33 -04:00
2026-04-30 14:19:46 -04:00
2026-04-30 14:19:46 -04:00
2026-05-01 19:50:10 -04:00
2026-05-09 14:21:42 -04:00
2026-05-14 12:43:48 -04:00
2026-05-01 19:50:10 -04:00
2026-05-06 21:51:38 -04:00
2026-05-15 10:07:10 -04:00
2026-05-14 09:11:59 -04:00
2026-05-01 19:50:10 -04:00
2026-05-04 23:28:20 -04:00
2026-04-30 21:57:27 -04:00
2026-04-04 14:29:03 -04:00
2026-04-05 10:23:41 -04:00
2026-05-01 19:50:10 -04:00
2026-04-11 11:19:47 -04:00
2026-05-01 19:50:10 -04:00
2026-04-04 14:29:03 -04:00
2026-05-01 19:50:10 -04:00
2026-04-16 17:22:31 -04:00
2026-04-30 00:43:47 -04:00
2026-04-30 00:43:47 -04:00
2026-05-13 14:10:15 -04:00
2026-05-13 14:10:15 -04:00
2026-05-13 14:10:15 -04:00
2026-04-26 13:33:45 -04:00
2026-04-30 14:10:28 -04:00
2026-05-06 21:51:38 -04:00
2026-04-23 11:53:20 -04:00
2026-05-10 14:43:53 -05:00
2026-05-15 11:10:03 -04:00
2026-05-10 17:39:06 -04:00
2026-05-01 19:50:10 -04:00
2026-04-01 16:53:20 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-02 09:27:23 -04:00
2026-04-20 10:08:18 -04:00
2026-05-01 19:50:10 -04:00
2026-04-04 07:10:21 -04:00
2026-05-12 21:53:24 -04:00
2026-05-01 19:50:10 -04:00
2026-04-10 13:55:27 -04:00
2026-05-13 17:12:53 -04:00
2026-05-09 02:49:19 -04:00
2026-05-08 09:06:43 -04:00
2026-05-14 22:17:20 -04:00
2026-04-11 15:02:55 -04:00
2026-05-08 23:53:21 -04:00
2026-05-06 21:51:38 -04:00
2026-05-01 19:50:10 -04:00
2026-05-13 12:45:16 -04:00
2026-05-13 12:45:16 -04:00
2026-05-13 12:45:16 -04:00
2026-05-13 12:45:16 -04:00
2026-05-13 12:45:16 -04:00
2026-04-11 15:39:50 -04:00
2026-04-11 09:15:00 -04:00
2026-05-01 19:50:10 -04:00
2026-04-05 17:49:20 -04:00
2026-05-01 19:50:10 -04:00
2026-05-05 15:44:59 -04:00
2026-05-02 16:33:16 -04:00
2026-04-20 10:08:18 -04:00
2026-05-15 12:59:18 -04:00
2026-05-01 09:22:13 -04:00
2026-05-15 19:32:02 -04:00
2026-04-12 17:56:19 -04:00
2026-04-25 16:26:15 -04:00
2026-05-06 21:51:38 -04:00
2026-05-01 19:50:10 -04:00
2026-05-06 21:51:38 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-04-04 14:29:03 -04:00
2026-05-01 19:50:10 -04:00
2026-04-04 14:29:03 -04:00
2026-04-06 08:40:37 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-15 22:02:55 -04:00
2026-04-30 00:43:47 -04:00
2026-05-15 09:35:02 -04:00
2026-05-09 14:21:42 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-13 18:33:32 -04:00
2026-05-01 19:50:10 -04:00
2026-04-04 14:29:03 -04:00