@@ -2,18 +2,18 @@
msd_state_version: "1.0"
milestone: v1.0
current_phase: 35
current_phase_name: mail-templates-and-layouts-editor
current_phase_name: Mail templates and layouts editor
status: executing
stopped_at: Completed 35-07-PLAN.md
last_updated: "2026-11-14T14:02:34.272Z"
last_activity: 2026-11-13
stopped_at: Completed 35-08-PLAN.md
last_updated: "2026-11-14T14:32:00.743Z"
last_activity: 2026-11-14
last_activity_desc: Phase 35 execution started
state_head: 6e8cead959c42abe21a0899cb47a8e593f7fd348
state_head: c4d0bbecc42a90f9d6c33ede91ea02c56f6b9884
progress:
total_phases: 52
completed_phases: 37
total_plans: 304
completed_plans: 291
completed_plans: 292
gsd_state_version: "1.0"
milestone_name: milestone
---
@@ -25,14 +25,14 @@ milestone_name: milestone
See: .planning/PROJECT.md (updated 2026-10-22)
**Core value:** An existing WinterCMS-shaped app can be ported plugin by plugin to a single Go binary without its frontend noticing: the PHP version's API contract is the acceptance test.
**Current focus:** Phase 35 — mail-templates-and-layouts-editor
**Current focus:** Phase 35 — Mail templates and layouts editor
## Current Position
Phase: 35 (mail-templates-and-layouts-editor) — READY TO EXECUTE
Plan: 4 of 4
Phase: 35 (Mail templates and layouts editor) — EXECUTING
Plan: 2 of 9
Status: Ready to execute
Last activity: 2026-11-13 — Phase 35 execution started
Last activity: 2026-11-14 — Phase 35 execution started
Progress: [████████░░] 82%
@@ -320,6 +320,7 @@ Progress: [████████░░] 82%
| Phase 35 P05 | 28 min | 3 tasks | 29 files |
| Phase 35 P06 | 33 min | 3 tasks | 34 files |
| Phase 35 P07 | 49 min | 3 tasks | 11 files |
| Phase 35 P08 | 24 min | 3 tasks | 22 files |
## Accumulated Context
@@ -1124,6 +1125,10 @@ Recent decisions affecting current work:
- [Phase 35]: 35-07: check-phase35.sh consumers run each core plugin through a scratch -modfile (sibling go.sum merged with the framework's, GOWORK=off, GOPROXY=off) and refuse a sibling that is dirty before or after
- [Phase 35]: 35-07: G-35-8 recorded as framework-closed with the plugin part deferred; UAT test 8 re-run scoped to the built-in layouts (default, system) with logo, site name and the button partial
- [Phase 35]: 35-07: Branding site name with a URL scheme stays an open item; TestMailBrandSiteName pins the current behaviour (saved, preview refused)
- [Phase 35]: 35-08: postcard checks URL schemes only in decoded URL-bearing attributes, CSS, comments and meta content (x/net/html tokenizer); text is not a URL, so prose site names no longer stop mail (CR-01)
- [Phase 35]: 35-08: postcard.UnsafeText (new exported API) drops unsafe site names at render with a value-free rate-limited warning and backs the Branding 422 on site_name (mail.brand.site_name_unsafe)
- [Phase 35]: 35-08: an inlined result that fails the safety check is sent un-inlined with the inline:<layout> warning; the footer partial's text argument prints the site name literally
- [Phase 35]: 35-08: cabana settings Put localizes BeforeValidate refusal phrase keys, as controller saves do
### Pending Todos
@@ -1271,6 +1276,6 @@ Items acknowledged and carried forward from previous milestone close:
## Session Continuity
Last session: 2026-11-13T21:11:20.401Z
Stopped at: Completed 35-07-PLAN.md
Last session: 2026-11-14T14:31:37.513Z
Stopped at: Completed 35-08-PLAN.md