Commit Graph

2046 Commits

Author SHA1 Message Date
4bb22a85dd test(32-01): add failing tests for form extension placement and save
- TestFormExtensionPlacement, TestFormExtensionBootErrors,
  TestFormExtensionTwoPluginsSameAnchor, TestFormExtensionOnePluginTwoControllers,
  TestFormExtensionUnextendedSchemaUnchanged, TestFormExtensionWidgetsAndPartials
- TestFormExtensionSave (Postgres): rollback, 422 lines, notices,
  invisible extensions, locale maps, hidden owner fields
- checkFormExtensionTabLabels declared (no-op) so the tests compile
2026-10-26 21:51:35 +01:00
0819442634 feat(32-01): cross-plugin admin form extensions (tracer)
- pact.AdminActionExtension.Form with AdminFormExtension: a fields
  document (fields.yaml format plus before:/after:/zone: and a tabs:
  list) given as an AdminFS path or YAML bytes, Load and Save hooks,
  AdminFormLoad/Save/SaveResult, AdminFormErrors and zone constants
- cabana compileFormExtensions places extension fields at owner
  anchors at boot, regrouping an extended form by tab
- save lifts extension values before any owner path and runs Save in
  the record's transaction after the owner row; show merges Load
- TestFormExtensionTracer: c after a on a, b gives a, c, b through the
  admin API, stored in the contributor's table
2026-10-26 21:46:43 +01:00
9868838fe3 docs(32): annotate roadmap with plan waves 2026-10-26 21:01:47 +01:00
641befc933 docs(32): revise plans after check 2026-10-26 21:00:14 +01:00
5d7e3caaea docs(32): create phase plan
Six plans per D-98: form extensions, record events and content
descriptors with Journal adoption, sm-seo-plugin core, redirects and
robots.txt, management API with MCP, batch, undo and CSV, then unit
tests and the patch release. COVERAGE.md declares no external API
integration.
2026-10-26 20:41:44 +01:00
748574c7cb docs(32): record D-106 patch release and repo creation 2026-10-26 20:11:38 +01:00
e3c0de24a6 docs(32): record planning decisions D-98 to D-105 2026-10-26 20:08:20 +01:00
62bcecf704 docs(32): pattern map 2026-10-26 20:07:10 +01:00
e0cf189ad8 docs(phase-32): add validation strategy 2026-10-26 20:04:32 +01:00
54d770740c docs(32): research phase domain 2026-10-26 20:03:37 +01:00
d661e1de95 docs(32): UI design contract
Admin surfaces for sm-seo-plugin: SEO tab, six custom elements, redirects, 404 log, URL rules, robots.txt, history, CSV import/export. Keyphrase stem matching decided (Q-4).
2026-10-26 19:45:16 +01:00
28b6b55f29 test(19.6): refresh verification and persist human verification items as UAT 2026-10-26 17:06:02 +01:00
d5aed6bb14 docs(19.6): phase verification report (human_needed) 2026-10-26 17:03:15 +01:00
bc8f9540a9 test(19.6): gate requires the code review regression tests 2026-10-26 17:03:15 +01:00
1769e15fbd docs(19.6): record code review disposition and the WR-05 todo 2026-10-26 16:43:41 +01:00
3cc5de056f docs(19.6): add code review fix report 2026-10-26 16:34:12 +01:00
680d4021e4 docs(19.6): add code review report 2026-10-26 15:45:43 +01:00
a70dbb6ff0 docs(todos): link two 19.6 todos to their g15office tasks 2026-10-26 15:36:59 +01:00
ac0599e78d docs(19.6-04): mark plan 04 complete in the roadmap 2026-10-26 15:35:09 +01:00
4925dddd40 docs(19.6-04): complete unit tests and security review plan 2026-10-26 15:34:38 +01:00
07f4632dc2 docs(19.6): v0.1.1 release recorded, finding F-1 deferred
- security review: T-19.6-37 closed by sm-mfa-plugin v0.1.1, F-1 deferred
  with the corrected reason for the activate-by-code mint path
- validation map: plan 04 Tasks 5 and 6 green
- todo for F-1; deferred items: tag message resolved, F-1 deferred
2026-10-26 15:34:38 +01:00
12b60d0194 docs(19.6-04): draft summary at the Task 5 release checkpoint 2026-10-26 15:06:45 +01:00
692beb5538 docs(19.6): security review and validation map
- 19.6-SECURITY-REVIEW.md: T-19.6-01..38 mapped to their tests or accepted
  dispositions, the D-14 passkey section, D-18 hardening, ASVS notes, log
  sweep, residual risks and open finding F-1 (activate-by-code)
- 19.6-VALIDATION.md: validated, one row per task of plans 01-04 with its
  gate stage and tests
2026-10-26 15:00:05 +01:00
ea4680eebe test(19.6): gate requires the PHP map
The mfa stage requires TestPHPMethodMap and TestPHPUser005 by name.
2026-10-26 14:54:08 +01:00
531e7abae7 test(19.6): gate requires the mfa and social gate tests
- mfa stage: the seven Docker-free decision tests by name
- docker stage: the sixteen Postgres decision tests of sm-mfa-plugin,
  TestEveryLoginPathIsGated included, and TestSocialGate
2026-10-26 14:51:38 +01:00
e9785f71de test(19.6): gate requires the user-plugin unit tests
- userplugin stage: TestLoginGates (also under -race), TestDeviceAuthURL,
  TestDeviceDisplayName and TestDeviceCodes in classes
- docker stage: the gate order, password-change sources, reset action and
  device-flow tests, and TestDeviceAuthSessionsMigration in updates
2026-10-26 14:19:01 +01:00
947009a62d test(19.6): fail-closed phase gate
- stages go, userplugin, mfa, sociallogin, demo, demo-web, bm, fonoteka,
  docker and docs across the seven repositories the phase touched
- go test -json detector refuses fail, skip, zero tests and missing names;
  --self-test proves it, the additive and migration checks and the docker
  NOT RUN rule on planted input
2026-10-26 13:58:35 +01:00
e95277a210 docs(19.6-03): mark plan 03 complete in the roadmap 2026-10-26 13:47:53 +01:00
d3b1636ac7 docs(19.6-03): complete WebAuthn and adoption plan
sm-demo-app mounts golem15.mfa v0.1.0 at user v0.1.12, sociallogin v0.1.4
and the two-factor UI (0eb1f60..bb24207, pushed with the 19 earlier
commits as 18597e5..bb24207, not deployed). The summary records the
"proceed" reply, the push checks and the tests. deferred-items.md gains the
private sm-mfa-plugin repository's effect on the demo's release build, and
a pending todo tracks the demo's leftover journal and oauthserver moves.
2026-10-26 13:47:45 +01:00
4002beafb6 docs(19.6-03): release and adoption up to the sm-demo-app checkpoint 2026-10-26 13:24:17 +01:00
5a6461123c docs(19.6-03): draft summary at the Task 4 release checkpoint
- WebAuthn and passkeys committed in sm-mfa-plugin (2662252, 6c8916f),
  demo two-factor UI in vue-demo-app (44a5229)
- sociallogin D-09 change kept as a patch: the checkout is jin's
- deferred items: sociallogin gofmt finding, no demo type check
2026-10-26 12:49:36 +01:00
5d78f53ddc docs(19.6-02): mark plan 02 complete in the roadmap 2026-10-26 11:22:11 +01:00
eb21d1f6e9 docs(19.6-02): complete sm-mfa-plugin core plan summary 2026-10-26 11:21:13 +01:00
33920ed558 docs(19.6-01): mark plan 01 complete in the roadmap 2026-10-26 10:50:20 +01:00
07c4e7f59e docs(19.6-01): complete foundations plan summary 2026-10-26 10:49:55 +01:00
24d9d2a401 docs(19.6): decide the OTP, WebAuthn and QR libraries
pquerna/otp v1.5.0, go-webauthn/webauthn v0.18.2 and boombuler/barcode
v1.1.0 (QR, with the plugin's own SVG writer), imported only by
sm-mfa-plugin and gated by a blocking human package check.
2026-10-26 09:49:40 +01:00
ecc34bc35a docs: narrow phase 32 and add phase 33 SEO output, audit and content 2026-10-25 22:26:43 +01:00
9a76c7ec1c docs(32): split SEO into phase 32 and a large phase 33 2026-10-25 22:25:33 +01:00
c5fee4c63a docs(32): set SEO code layout, resolve phase split, confirm D-32
SEO moves to sm-seo-plugin and sm-sitemap-plugin on three generic
framework seams (form extensions with field placement, record events,
signpost content descriptors), following the mpseo pattern. Phase 32 is
split into 32/33/34.
2026-10-25 19:49:19 +01:00
723c27e352 docs(state): record phase 32 context session 2026-10-24 16:47:38 +02:00
7fd23f0642 docs(32): capture phase context 2026-10-24 16:47:37 +02:00
6bc7b5cb20 docs: g15office task for phase 32 2026-10-24 16:07:18 +02:00
07e32b5be8 docs: add phase 32 SEO foundation to the roadmap 2026-10-24 16:06:53 +02:00
223f87e0f1 docs(phase-19.7): update validation strategy v0.5.0 2026-10-24 00:39:40 +02:00
49a3df68c8 test(phase-19.7): add Nyquist validation tests 2026-10-24 00:38:42 +02:00
505b8991ee docs(19.7): verification passed after UAT 2026-10-24 00:31:40 +02:00
691459174a test(19.7): complete UAT - 5 passed, 0 issues 2026-10-24 00:31:27 +02:00
eb9a62a5ec test(19.7): accept the SC-3 group-grant override in UAT 2026-10-24 00:17:04 +02:00
b8e7ba9d4f docs(19.7): keep coverage matrix rows within the gate's length limit 2026-10-24 00:16:28 +02:00
1038034078 docs(19.7): add MCP API coverage matrix 2026-10-24 00:16:16 +02:00