Tom Boucher
2d14eb8873
feat(observability): add DispatchLogger seam — ADR-0174 SDK retirement Phase 1.3 ( #177 ) ( #223 )
...
* test(#177 ): add DispatchEvent factory failing tests
Red tests for makeDispatchEvent shape, traceId UUID v4, uniqueness,
parentTraceId-always-undefined (P1.3), args redaction toggle, ISO 8601
timestamp, and all result variant passthrough.
* feat(#177 ): introduce DispatchEvent factory
makeDispatchEvent produces an immutable event record per dispatch:
- traceId: crypto.randomUUID() (UUID v4)
- parentTraceId: always undefined (P1.4 wires composer)
- command, result, timestamp (ISO 8601)
- args only included when includeArgs === true (default: omitted)
* test(#177 ): add arg redaction policy failing tests
Red tests for shouldIncludeArgs (GSD_AUDIT_ARGS env gating) and
redactEvent (strips args from frozen events, preserves all other
fields, returns a new object, never mutates the source).
* feat(#177 ): introduce arg redaction policy
shouldIncludeArgs(): only GSD_AUDIT_ARGS==='1' opts in; all other
values (unset, '', '0', 'true') default to omitting args.
redactEvent(event): returns a shallow copy of the event, dropping the
args field unless opted in. Never mutates the (frozen) source event.
* test(#177 ): add DispatchLogger interface failing tests
Red tests covering:
- no-op logger: silent on all events, never throws
- default logger: silent on ok, one flattened JSON line to stderr on error
- default logger: audit file creation + append-only + redaction + config gate
- GSD_AUDIT env var and config.audit.enabled config gate
- GSD_AUDIT_ARGS opt-in for args inclusion
All tests use real fs under os.tmpdir() — no mocked appendFileSync.
* feat(#177 ): introduce DispatchLogger with default and no-op implementations
createNoOpLogger(): silent on all events — Hub default when no logger injected.
createDefaultLogger({ cwd, config }):
- Silent on ok result
- Flattened JSON line to stderr on error: { kind, traceId, ...typedPayload }
- Append-only audit at .planning/.gsd-trace.jsonl when GSD_AUDIT=1 or config.audit.enabled
- Args redacted by default; GSD_AUDIT_ARGS=1 opts in
- Logger errors caught internally; never break dispatch callers
* test(#177 ): add Hub+logger integration failing tests
Red tests verifying:
- onEvent called exactly once per dispatch (ok, error, handler-throw, unknown)
- DispatchEvent shape: traceId uniqueness, command, result.kind, parentTraceId
- Logger errors contained (dispatch still returns Result, warn line to stderr)
- Hub defaults to no-op when no logger injected
- End-to-end with createDefaultLogger: silent on success, stderr on error, audit file
* feat(#177 ): wire DispatchLogger into CommandRoutingHub
Add optional logger param to createHub({ ..., logger }).
Defaults to createNoOpLogger() — silent, no behaviour change for callers
that don't inject a logger.
After every dispatch (success and error):
- Normalises HubResult { ok } to DispatchEvent { kind: 'ok'|error-kind }
- Calls makeDispatchEvent({ command, args, result }) to mint the event
- Calls logger.onEvent(event) exactly once
- Wraps in try/catch: logger errors emit { level:'warn', source:'DispatchLogger' }
to stderr but never propagate to dispatch callers
* chore(#177 ): gitignore .planning/.gsd-trace.jsonl audit file
The audit trail is local-only, append-only, and must never be committed.
Slotted under the existing "Local scratch + Claude-test artifacts" block.
* docs(#177 ): document GSD_AUDIT, GSD_AUDIT_ARGS, config.audit.enabled
New ## Observability section at end of CONFIGURATION.md covering:
- Default silent/stderr behaviour overview
- Stderr error JSON format
- Audit file opt-in (env var and config key)
- Args redaction policy and GSD_AUDIT_ARGS opt-in
Also slots GSD_AUDIT and GSD_AUDIT_ARGS into the existing
## Environment Variables table (alphabetical order).
* chore(#177 ): add changeset for observability seam
type: Added — new DispatchLogger seam with default silent/stderr/audit behaviour.
2026-05-24 15:22:36 -04:00
..
2026-05-23 18:38:49 -04:00
2026-05-20 20:39:17 -04:00
2026-05-24 15:22:36 -04:00
2026-05-23 21:47:11 -04:00
2026-05-23 15:51:34 -04:00
2026-05-23 15:57:33 -04:00
2026-05-09 00:15:04 -04:00
2026-05-11 23:01:34 -04:00
2026-04-25 10:50:54 -04:00
2026-05-16 13:14:24 -04:00
2026-05-22 12:28:16 -04:00
2026-05-22 12:28:16 -04:00
2026-04-25 10:50:54 -04:00
2026-04-11 03:39:29 -07:00
2026-04-20 09:31:34 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-13 19:34:23 -04:00
2026-05-01 19:50:10 -04:00
2026-04-04 14:29:03 -04:00
2026-04-25 10:50:54 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-20 23:08:56 -04:00
2026-05-23 18:10:19 -04:00
2026-05-23 14:56:35 -04:00
2026-05-24 13:30:00 -04:00
2026-05-23 00:24:32 -04:00
2026-05-24 14:37:10 -04:00
2026-05-24 14:16:30 -04:00
2026-05-17 12:00:59 -04:00
2026-04-07 08:13:52 -04:00
2026-04-05 17:49:20 -04:00
2026-05-02 11:45:33 -04:00
2026-04-05 18:05:32 -04:00
2026-05-08 21:25:37 -04:00
2026-04-19 16:35:32 -05:00
2026-04-25 11:34:55 -04:00
2026-05-12 19:02:18 -04:00
2026-04-07 17:19:10 -04:00
2026-05-17 12:00:59 -04:00
2026-05-01 19:50:10 -04:00
2026-05-23 18:39:02 -04:00
2026-04-10 11:19:32 -04:00
2026-04-10 11:25:55 -04:00
2026-05-16 12:16:20 -04:00
2026-05-16 12:39:02 -04:00
2026-05-16 12:52:46 -04:00
2026-04-17 09:20:26 -04:00
2026-05-22 16:22:41 -04:00
2026-04-22 10:41:58 -04:00
2026-04-25 12:02:58 -04:00
2026-04-17 09:20:42 -04:00
2026-04-29 07:56:51 -04:00
2026-05-22 14:54:20 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-04-20 10:09:33 -04:00
2026-05-11 15:27:35 -04:00
2026-05-01 19:50:10 -04:00
2026-04-30 00:43:47 -04:00
2026-04-20 10:11:00 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-04-20 10:08:46 -04:00
2026-05-01 19:50:10 -04:00
2026-05-15 00:02:56 -04:00
2026-05-22 14:54:20 -04:00
2026-05-01 19:50:10 -04:00
2026-04-21 21:20:27 -04:00
2026-04-21 10:10:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-22 16:22:41 -04:00
2026-04-22 10:41:58 -04:00
2026-04-21 20:33:43 -04:00
2026-05-03 16:31:48 -04:00
2026-05-06 15:19:34 -04:00
2026-05-23 18:42:47 -04:00
2026-04-22 12:04:17 -04:00
2026-05-01 19:50:10 -04:00
2026-04-22 12:03:56 -04:00
2026-05-12 19:02:18 -04:00
2026-05-01 19:50:10 -04:00
2026-04-25 12:09:27 -04:00
2026-04-24 18:05:10 -04:00
2026-05-22 16:22:41 -04:00
2026-04-24 18:05:33 -04:00
2026-04-29 22:56:59 -04:00
2026-05-22 16:22:41 -04:00
2026-05-22 16:22:41 -04:00
2026-04-24 20:22:17 -04:00
2026-04-24 20:22:29 -04:00
2026-05-22 14:54:20 -04:00
2026-04-25 12:10:01 -04:00
2026-04-25 12:16:04 -04:00
2026-04-25 12:15:39 -04:00
2026-05-02 09:27:23 -04:00
2026-05-16 12:39:02 -04:00
2026-05-20 23:13:50 -04:00
2026-05-20 23:11:33 -04:00
2026-04-27 12:31:49 -04:00
2026-05-01 19:50:10 -04:00
2026-05-11 14:36:14 -04:00
2026-05-01 19:50:10 -04:00
2026-05-22 16:22:41 -04:00
2026-05-16 12:39:02 -04:00
2026-04-28 20:22:59 -04:00
2026-04-28 20:23:32 -04:00
2026-05-16 12:52:46 -04:00
2026-05-02 09:27:23 -04:00
2026-05-20 22:39:34 -04:00
2026-05-16 11:55:55 -04:00
2026-04-28 20:21:48 -04:00
2026-04-28 20:23:29 -04:00
2026-05-17 12:00:59 -04:00
2026-05-22 16:22:41 -04:00
2026-05-01 19:50:10 -04:00
2026-05-15 22:02:55 -04:00
2026-05-22 14:54:20 -04:00
2026-05-16 11:49:26 -04:00
2026-04-29 21:52:20 -04:00
2026-05-22 08:27:07 -04:00
2026-05-22 08:27:07 -04:00
2026-04-30 17:30:19 -04:00
2026-04-30 21:08:26 -04:00
2026-04-30 21:57:27 -04:00
2026-05-01 09:22:13 -04:00
2026-05-20 20:38:53 -04:00
2026-05-12 21:53:24 -04:00
2026-05-12 21:53:24 -04:00
2026-05-15 22:02:55 -04:00
2026-05-15 22:02:55 -04:00
2026-05-16 12:03:44 -04:00
2026-05-01 16:10:30 -04:00
2026-05-01 17:25:20 -04:00
2026-05-16 12:39:02 -04:00
2026-05-01 15:15:20 -04:00
2026-05-20 23:13:25 -04:00
2026-05-17 12:00:59 -04:00
2026-05-24 14:16:16 -04:00
2026-05-15 22:43:21 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 17:25:20 -04:00
2026-05-01 21:13:25 -04:00
2026-05-01 17:39:35 -04:00
2026-05-02 00:29:43 -04:00
2026-05-22 16:22:41 -04:00
2026-05-02 00:29:34 -04:00
2026-05-02 00:29:34 -04:00
2026-05-01 21:14:14 -04:00
2026-05-22 16:22:41 -04:00
2026-05-16 12:16:20 -04:00
2026-05-02 11:45:36 -04:00
2026-05-02 11:45:33 -04:00
2026-05-02 11:45:39 -04:00
2026-05-22 16:22:41 -04:00
2026-05-02 17:44:52 -04:00
2026-05-04 23:34:57 -04:00
2026-05-04 23:30:35 -04:00
2026-05-16 11:55:55 -04:00
2026-05-04 22:52:30 -04:00
2026-05-14 12:06:36 -04:00
2026-05-05 15:02:03 -04:00
2026-05-22 16:22:41 -04:00
2026-05-05 15:02:23 -04:00
2026-05-05 15:02:26 -04:00
2026-05-05 15:02:19 -04:00
2026-05-24 14:17:03 -04:00
2026-05-05 15:02:30 -04:00
2026-05-09 11:39:31 -04:00
2026-05-05 15:02:15 -04:00
2026-05-22 16:22:41 -04:00
2026-05-05 15:02:38 -04:00
2026-05-05 18:53:35 -04:00
2026-05-06 21:51:38 -04:00
2026-05-06 21:51:38 -04:00
2026-05-06 15:00:08 -04:00
2026-05-06 22:06:56 -04:00
2026-05-22 14:54:20 -04:00
2026-05-06 21:51:42 -04:00
2026-05-22 16:22:41 -04:00
2026-05-15 00:02:56 -04:00
2026-05-08 08:40:53 -04:00
2026-05-22 16:22:41 -04:00
2026-05-08 08:40:41 -04:00
2026-05-09 14:21:42 -04:00
2026-05-08 08:40:36 -04:00
2026-05-08 10:25:59 -04:00
2026-05-08 09:26:35 -04:00
2026-05-08 09:06:37 -04:00
2026-05-08 23:53:21 -04:00
2026-05-09 07:42:22 -04:00
2026-05-09 07:40:56 -04:00
2026-05-16 12:52:46 -04:00
2026-05-22 16:22:41 -04:00
2026-05-09 19:27:36 -04:00
2026-05-16 11:55:55 -04:00
2026-05-14 12:59:38 -04:00
2026-05-20 23:13:50 -04:00
2026-05-22 16:22:41 -04:00
2026-05-22 14:54:20 -04:00
2026-05-22 14:54:20 -04:00
2026-05-10 19:48:28 -04:00
2026-05-22 16:22:41 -04:00
2026-05-22 11:24:14 -04:00
2026-05-12 20:15:43 -04:00
2026-05-11 22:09:59 -04:00
2026-05-20 23:13:50 -04:00
2026-05-20 23:13:50 -04:00
2026-05-12 18:50:35 -04:00
2026-05-12 18:50:19 -04:00
2026-05-12 19:19:04 -04:00
2026-05-12 20:15:43 -04:00
2026-05-12 20:49:43 -04:00
2026-05-18 12:42:43 -04:00
2026-05-13 13:54:30 -04:00
2026-05-14 07:47:18 -04:00
2026-05-16 12:52:46 -04:00
2026-05-14 12:49:48 -04:00
2026-05-14 19:00:32 -04:00
2026-05-22 14:54:20 -04:00
2026-05-14 19:47:48 -04:00
2026-05-14 23:17:38 -04:00
2026-05-15 09:16:41 -04:00
2026-05-16 12:16:20 -04:00
2026-05-22 16:22:41 -04:00
2026-05-15 14:54:58 -04:00
2026-05-16 12:52:46 -04:00
2026-05-15 22:56:32 -04:00
2026-05-23 18:39:02 -04:00
2026-05-23 18:39:02 -04:00
2026-05-16 14:00:34 -04:00
2026-05-15 22:08:28 -04:00
2026-05-15 21:54:03 -04:00
2026-05-24 14:17:03 -04:00
2026-05-22 16:22:41 -04:00
2026-05-15 22:43:21 -04:00
2026-05-16 00:07:59 -04:00
2026-05-16 13:14:24 -04:00
2026-05-20 23:13:25 -04:00
2026-05-20 23:12:44 -04:00
2026-05-22 14:54:20 -04:00
2026-05-22 12:28:16 -04:00
2026-05-17 19:31:31 -04:00
2026-05-18 00:14:03 -04:00
2026-05-18 00:13:59 -04:00
2026-05-18 00:13:59 -04:00
2026-05-21 23:19:52 -04:00
2026-05-18 12:42:43 -04:00
2026-05-22 11:53:40 -04:00
2026-05-20 23:08:56 -04:00
2026-05-20 15:22:12 -04:00
2026-05-20 23:09:42 -04:00
2026-05-20 23:10:09 -04:00
2026-05-20 22:39:34 -04:00
2026-05-20 23:11:33 -04:00
2026-05-20 23:11:33 -04:00
2026-05-24 14:37:10 -04:00
2026-05-22 11:39:57 -04:00
2026-05-22 11:39:51 -04:00
2026-05-22 11:23:58 -04:00
2026-05-01 19:50:10 -04:00
2026-05-22 16:22:41 -04:00
2026-05-01 19:50:10 -04:00
2026-05-22 11:51:37 -04:00
2026-05-22 16:22:41 -04:00
2026-05-01 18:12:20 -04:00
2026-05-16 13:09:54 -04:00
2026-05-16 13:09:54 -04:00
2026-05-01 18:12:20 -04:00
2026-05-22 11:51:37 -04:00
2026-05-23 18:38:49 -04:00
2026-05-01 19:50:10 -04:00
2026-05-24 14:16:16 -04:00
2026-05-20 20:57:06 -04:00
2026-04-11 09:15:36 -04:00
2026-05-15 19:32:02 -04:00
2026-05-17 12:00:59 -04:00
2026-04-20 09:31:34 -04:00
2026-05-22 16:22:41 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-08 23:53:32 -04:00
2026-04-12 08:10:30 -04:00
2026-05-01 19:50:10 -04:00
2026-05-17 12:00:59 -04:00
2026-05-20 23:13:50 -04:00
2026-05-05 16:06:29 -04:00
2026-05-24 14:20:28 -04:00
2026-05-09 02:49:19 -04:00
2026-05-14 20:01:32 -04:00
2026-04-05 17:02:20 -04:00
2026-04-10 10:56:09 -04:00
2026-05-23 16:22:31 -04:00
2026-04-25 11:34:55 -04:00
2026-04-07 17:25:11 -04:00
2026-05-01 19:50:10 -04:00
2026-05-18 23:13:09 -04:00
2026-05-23 18:39:02 -04:00
2026-05-15 00:02:56 -04:00
2026-05-15 00:02:56 -04:00
2026-05-01 19:50:10 -04:00
2026-04-30 01:04:41 -04:00
2026-05-09 11:39:24 -04:00
2026-05-17 12:00:59 -04:00
2026-05-13 20:46:02 -04:00
2026-04-11 09:20:27 -04:00
2026-04-04 14:29:03 -04:00
2026-05-15 22:02:55 -04:00
2026-05-13 14:11:02 -04:00
2026-05-16 13:14:24 -04:00
2026-04-05 09:15:41 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-04-25 11:34:55 -04:00
2026-05-01 19:50:10 -04:00
2026-05-14 12:43:48 -04:00
2026-05-23 18:38:49 -04:00
2026-04-01 08:47:31 -06:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-04-25 16:26:15 -04:00
2026-05-05 15:44:59 -04:00
2026-05-22 14:54:20 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-06 21:51:29 -04:00
2026-05-16 12:39:02 -04:00
2026-04-22 12:04:21 -04:00
2026-04-29 08:14:11 -04:00
2026-05-16 12:39:02 -04:00
2026-05-22 14:54:20 -04:00
2026-04-30 00:48:49 -04:00
2026-05-14 16:38:05 -04:00
2026-05-11 23:01:34 -04:00
2026-05-16 12:03:44 -04:00
2026-05-06 21:51:38 -04:00
2026-05-01 19:50:10 -04:00
2026-05-10 19:48:28 -04:00
2026-05-15 22:02:55 -04:00
2026-05-01 19:50:10 -04:00
2026-05-06 21:51:38 -04:00
2026-05-01 19:50:10 -04:00
2026-05-05 16:06:29 -04:00
2026-04-22 20:49:52 -04:00
2026-05-12 21:53:24 -04:00
2026-05-02 23:12:50 -04:00
2026-05-20 20:57:06 -04:00
2026-05-16 12:52:46 -04:00
2026-05-02 15:24:26 -04:00
2026-05-15 22:02:55 -04:00
2026-05-11 15:27:40 -04:00
2026-05-15 00:02:56 -04:00
2026-05-13 21:19:47 -04:00
2026-05-15 20:22:11 -04:00
2026-05-09 11:46:34 -04:00
2026-05-09 11:39:31 -04:00
2026-05-09 23:29:11 -04:00
2026-05-09 13:54:06 -04:00
2026-05-15 23:57:38 -04:00
2026-05-15 23:57:38 -04:00
2026-05-15 23:57:38 -04:00
2026-05-16 00:23:27 -04:00
2026-05-16 00:23:27 -04:00
2026-05-16 00:23:27 -04:00
2026-05-16 12:52:46 -04:00
2026-05-17 00:56:14 -04:00
2026-05-16 12:39:02 -04:00
2026-05-22 13:16:47 -04:00
2026-05-14 12:43:48 -04:00
2026-04-26 21:40:38 -04:00
2026-05-01 19:50:10 -04:00
2026-05-10 17:39:06 -04:00
2026-05-23 19:33:54 -04:00
2026-05-22 11:24:06 -04:00
2026-05-20 20:39:17 -04:00
2026-05-20 20:39:17 -04:00
2026-05-20 20:39:17 -04:00
2026-05-01 19:50:10 -04:00
2026-05-06 21:01:25 -04:00
2026-05-20 20:57:06 -04:00
2026-05-20 20:57:06 -04:00
2026-05-06 21:51:38 -04:00
2026-05-16 12:39:02 -04:00
2026-05-05 18:34:42 -04:00
2026-04-15 22:46:31 -04:00
2026-04-04 14:37:54 -04:00
2026-04-04 14:29:03 -04:00
2026-05-23 23:10:06 -04:00
2026-05-17 12:00:59 -04:00
2026-04-04 14:29:03 -04:00
2026-04-20 09:31:34 -04:00
2026-05-02 09:27:23 -04:00
2026-05-01 19:50:10 -04:00
2026-05-06 20:27:33 -04:00
2026-05-20 20:39:01 -04:00
2026-04-27 12:31:49 -04:00
2026-05-01 19:50:10 -04:00
2026-05-20 23:10:09 -04:00
2026-05-16 12:16:20 -04:00
2026-05-20 20:38:30 -04:00
2026-05-20 20:38:30 -04:00
2026-05-13 12:45:16 -04:00
2026-05-24 14:17:03 -04:00
2026-05-11 14:36:14 -04:00
2026-05-17 12:00:59 -04:00
2026-05-15 08:16:28 -04:00
2026-05-20 23:12:08 -04:00
2026-04-15 14:59:24 -04:00
2026-05-01 19:50:10 -04:00
2026-04-20 09:39:05 -04:00
2026-04-20 09:39:05 -04:00
2026-05-01 19:50:10 -04:00
2026-04-26 13:33:54 -04:00
2026-05-01 19:50:10 -04:00
2026-04-05 19:09:14 -04:00
2026-05-16 13:33:24 -04:00
2026-05-16 13:33:24 -04:00
2026-05-16 13:14:24 -04:00
2026-05-13 12:45:16 -04:00
2026-05-20 20:37:07 -04:00
2026-05-22 11:51:37 -04:00
2026-04-14 17:57:38 -04:00
2026-05-01 19:50:10 -04:00
2026-04-04 14:29:03 -04:00
2026-05-20 20:38:53 -04:00
2026-05-20 20:38:53 -04:00
2026-05-20 20:38:53 -04:00
2026-04-26 11:48:47 -04:00
2026-05-09 00:15:04 -04:00
2026-05-08 21:25:37 -04:00
2026-04-30 22:48:08 -04:00
2026-05-06 21:51:38 -04:00
2026-05-06 21:51:38 -04:00
2026-05-06 21:51:38 -04:00
2026-04-05 18:05:32 -04:00
2026-05-06 21:51:38 -04:00
2026-04-07 08:13:46 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 16:10:30 -04:00
2026-05-23 15:50:17 -04:00
2026-05-01 19:50:10 -04:00
2026-05-09 00:15:04 -04:00
2026-05-01 19:50:10 -04:00
2026-05-08 09:08:06 -04:00
2026-04-06 15:13:23 -04:00
2026-05-01 19:50:10 -04:00
2026-05-14 10:21:11 -04:00
2026-04-16 17:15:29 -04:00
2026-04-04 14:29:03 -04:00
2026-05-21 23:32:10 -04:00
2026-05-22 16:54:10 -04:00
2026-05-16 13:14:24 -04:00
2026-04-04 14:29:03 -04:00
2026-04-25 12:02:58 -04:00
2026-05-06 21:51:38 -04:00
2026-05-01 19:50:10 -04:00
2026-05-15 00:02:56 -04:00
2026-05-16 13:14:24 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-06 21:51:38 -04:00
2026-04-30 11:38:13 -04:00
2026-05-01 19:50:10 -04:00
2026-04-30 12:13:55 -04:00
2026-05-18 12:06:46 -04:00
2026-04-30 14:19:46 -04:00
2026-04-30 14:19:46 -04:00
2026-05-01 19:50:10 -04:00
2026-05-09 14:21:42 -04:00
2026-05-14 12:43:48 -04:00
2026-05-01 19:50:10 -04:00
2026-05-06 21:51:38 -04:00
2026-05-16 12:52:46 -04:00
2026-05-18 23:13:09 -04:00
2026-05-18 23:13:09 -04:00
2026-05-18 23:13:09 -04:00
2026-05-16 12:39:02 -04:00
2026-05-01 19:50:10 -04:00
2026-05-16 12:39:02 -04:00
2026-04-30 21:57:27 -04:00
2026-04-04 14:29:03 -04:00
2026-04-05 10:23:41 -04:00
2026-05-01 19:50:10 -04:00
2026-05-17 12:00:59 -04:00
2026-04-04 14:29:03 -04:00
2026-05-01 19:50:10 -04:00
2026-04-16 17:22:31 -04:00
2026-04-30 00:43:47 -04:00
2026-04-30 00:43:47 -04:00
2026-05-18 13:05:02 -04:00
2026-05-23 00:24:32 -04:00
2026-05-13 14:10:15 -04:00
2026-05-13 14:10:15 -04:00
2026-05-13 14:10:15 -04:00
2026-04-26 13:33:45 -04:00
2026-05-16 13:14:24 -04:00
2026-05-06 21:51:38 -04:00
2026-04-23 11:53:20 -04:00
2026-05-10 14:43:53 -05:00
2026-05-16 09:25:36 -04:00
2026-05-20 23:10:09 -04:00
2026-05-20 23:12:44 -04:00
2026-05-20 20:39:09 -04:00
2026-05-16 12:03:44 -04:00
2026-05-10 17:39:06 -04:00
2026-05-01 19:50:10 -04:00
2026-05-16 13:14:24 -04:00
2026-04-01 16:53:20 -04:00
2026-05-01 19:50:10 -04:00
2026-05-23 10:58:14 -04:00
2026-05-16 13:14:24 -04:00
2026-05-01 19:50:10 -04:00
2026-05-23 10:15:03 -04:00
2026-05-23 10:14:48 -04:00
2026-04-20 10:08:18 -04:00
2026-05-01 19:50:10 -04:00
2026-04-04 07:10:21 -04:00
2026-05-12 21:53:24 -04:00
2026-05-01 19:50:10 -04:00
2026-04-10 13:55:27 -04:00
2026-05-13 17:12:53 -04:00
2026-05-09 02:49:19 -04:00
2026-05-16 12:39:02 -04:00
2026-05-20 15:56:22 -04:00
2026-05-14 22:17:20 -04:00
2026-04-11 15:02:55 -04:00
2026-05-08 23:53:21 -04:00
2026-05-06 21:51:38 -04:00
2026-05-01 19:50:10 -04:00
2026-04-11 15:39:50 -04:00
2026-04-11 09:15:00 -04:00
2026-05-01 19:50:10 -04:00
2026-04-05 17:49:20 -04:00
2026-05-01 19:50:10 -04:00
2026-05-05 15:44:59 -04:00
2026-04-20 10:08:18 -04:00
2026-05-22 14:54:20 -04:00
2026-05-01 09:22:13 -04:00
2026-05-15 19:32:02 -04:00
2026-04-12 17:56:19 -04:00
2026-04-25 16:26:15 -04:00
2026-05-06 21:51:38 -04:00
2026-05-22 11:23:50 -04:00
2026-05-06 21:51:38 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-04-04 14:29:03 -04:00
2026-05-22 12:28:16 -04:00
2026-05-16 12:39:02 -04:00
2026-04-04 14:29:03 -04:00
2026-04-06 08:40:37 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-17 11:16:54 -04:00
2026-05-22 12:28:16 -04:00
2026-05-16 12:16:20 -04:00
2026-05-15 09:35:02 -04:00
2026-05-16 13:14:24 -04:00
2026-05-09 14:21:42 -04:00
2026-05-22 14:54:20 -04:00
2026-05-22 11:23:34 -04:00
2026-05-22 14:54:20 -04:00