Commit Graph

431 Commits

Author SHA1 Message Date
Jakub Zych
75f45933b8 docs(phase-32.2): update tracking after wave 4 2026-11-21 02:31:05 +01:00
Jakub Zych
d450a6819e docs(phase-32.2): update tracking after wave 3 2026-11-21 01:40:46 +01:00
Jakub Zych
fdcab18bb8 docs(phase-32.2): update tracking after wave 2 2026-11-21 01:27:06 +01:00
Jakub Zych
26af5f9549 docs(phase-32.2): update tracking after plan 32.2-02 2026-11-21 00:59:08 +01:00
Jakub Zych
1d3e6df6ec docs(phase-32.2): update tracking after wave 1 2026-11-21 00:35:58 +01:00
Jakub Zych
45eb34e5c4 docs(32.2): create phase plan
Five plans in four waves: framework seams, admin SPA consent route and plugin backend mode in parallel, app wiring with a local proof, then unit tests and the release checkpoint. Research open questions marked resolved.
2026-11-20 23:52:23 +01:00
Jakub Zych
6c44946dfa docs(state): insert phase 32.2 and record its context session 2026-11-20 20:39:26 +01:00
Jakub Zych
4d3b1e9f62 docs(phase-35): complete phase - UAT 14/14 (real-inbox check passed, G-35-9 framework part resolved) 2026-11-16 10:05:23 +01:00
Jakub Zych
9ff6e1a2e8 docs(35-09): record plan completion in state and roadmap 2026-11-14 16:09:00 +01:00
Jakub Zych
8751f92230 docs(35-08): record plan completion in state and roadmap 2026-11-14 15:32:25 +01:00
Jakub Zych
6e8cead959 docs(35): plan gap closure for CR-01
Two gap-closure plans confirmed by the user:
- 35-08: URL-scheme check on decoded attribute values instead of the whole
  document, unsafe site names dropped at render with a warning and refused
  on the Branding form (postcard.UnsafeText), the inlined result never
  stops mail, literal site name in the footer (CR-01, WR-01, WR-05)
- 35-09: regression and unit tests, new names required by
  check-phase35.sh, IN-03 self-test fix, validation map
2026-11-14 14:59:30 +01:00
Jakub Zych
0bef6b3098 docs(35-07): update state and roadmap after plan 35-07 2026-11-13 22:11:33 +01:00
Jakub Zych
0e97113a4f docs(35-06): update state and roadmap after plan 35-06 2026-11-13 21:19:40 +01:00
Jakub Zych
fdc2094ffc docs(35-05): update state and roadmap after plan 35-05 2026-11-13 20:43:50 +01:00
Jakub Zych
293400e61f docs(35): plan gap closure for G-35-1 and G-35-8
Three gap-closure plans confirmed by the user:
- 35-05: one admin record per mail template with a locale switcher (supersedes D-05)
- 35-06: finished built-in layouts, Branding site name, CSS inlining via go-premailer (supersedes D-10's inlining claim)
- 35-07: unit tests for both gaps and a read-only scratch-modfile consumers stage
2026-11-13 16:43:14 +01:00
5eb866b37a docs(35): mark plan 04 complete in STATE and ROADMAP
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-11-13 14:31:53 +01:00
95eed7ad98 docs(35-03): complete mail templates SPA editor plan 2026-11-13 13:43:33 +01:00
9ea3159ba2 fix(31): reslice plans after checker feedback 2026-11-13 13:07:56 +01:00
da6bfa9e48 docs(35-02): record plan progress in state and roadmap
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-11-13 13:05:49 +01:00
Jakub Zych
2acf8e46c4 docs(31): split into 31, 31.1 and 31.2 and record the planning decisions 2026-11-13 11:29:37 +01:00
Jakub Zych
db86b51a51 docs(35-01): complete mail domain layer plan 2026-11-13 11:11:01 +01:00
Jakub Zych
6f9b77033f docs(35): create phase plan (4 plans, 4 waves) 2026-11-06 19:43:03 +01:00
Jakub Zych
c755209964 docs: add phase 35 - mail templates and layouts editor 2026-11-06 10:18:59 +01:00
Jakub Zych
7b8d205613 docs: add backlog item 999.2, SEO follow-ups after Phase 33 (v0.6.2) 2026-11-05 02:33:31 +01:00
Jakub Zych
7049dffd9a docs(phase-33): tick 33-14 in the roadmap 2026-11-05 02:26:02 +01:00
Jakub Zych
5ce50bedfb docs(phase-33): update tracking after 33-15 2026-11-04 23:42:46 +01:00
Jakub Zych
0e951270aa docs(phase-33): update tracking after 33-16 2026-11-04 22:58:55 +01:00
Jakub Zych
8d562004cb docs(33): gap-closure plans 33-15 (Go plugins) and 33-16 (Nuxt layers) 2026-11-04 22:37:13 +01:00
Jakub Zych
96750982f2 docs(phase-33): update tracking after 33-13 2026-11-04 19:14:33 +01:00
Jakub Zych
c59b3e61ed docs(phase-33): update tracking after 33-12 2026-11-04 18:13:05 +01:00
Jakub Zych
617e15dcf0 docs(phase-33): update tracking after 33-11 2026-11-04 17:23:25 +01:00
Jakub Zych
3bfdc8616e docs(phase-33): update tracking after 33-10 2026-11-04 16:10:14 +01:00
Jakub Zych
e245b54ad9 docs(phase-33): update tracking after 33-06 2026-11-04 14:44:16 +01:00
Jakub Zych
bd36b18729 docs(phase-33): update tracking after 33-09 2026-11-04 14:22:51 +01:00
Jakub Zych
122aa0786e docs(phase-33): update tracking after 33-05 2026-11-04 13:55:11 +01:00
Jakub Zych
1cc47f6d83 docs(phase-33): update tracking after 33-04 2026-11-04 12:45:25 +01:00
Jakub Zych
7bf3399a69 docs(phase-33): update tracking after 33-08 2026-11-04 12:07:28 +01:00
Jakub Zych
0785336a50 docs(phase-33): update tracking after 33-03 2026-11-04 11:29:49 +01:00
Jakub Zych
1e38cb2da2 docs(phase-33): update tracking after 33-02 2026-11-04 10:41:26 +01:00
Jakub Zych
770aa1e216 docs(phase-33): update tracking after 33-07 2026-11-04 09:36:34 +01:00
Jakub Zych
b6180a7dac docs(phase-33): update tracking after 33-01 2026-11-04 08:51:10 +01:00
Jakub Zych
2035563fc7 docs(phase-20): update tracking after wave 7 2026-11-02 18:50:35 +01:00
Jakub Zych
762f0ae9aa docs(phase-20): add gap-closure plans 20-07 to 20-09 to the roadmap 2026-11-02 18:23:43 +01:00
Jakub Zych
a4b32b14e6 docs(phase-20): update tracking after wave 6 2026-11-02 00:38:09 +01:00
Jakub Zych
8a3ac87abb docs(phase-20): update tracking after wave 5 2026-11-01 18:41:06 +01:00
Jakub Zych
6389479906 docs(phase-20): update tracking after wave 4 2026-10-31 20:11:45 +01:00
Jakub Zych
b40c519747 docs(phase-20): update tracking after wave 3 2026-10-31 14:20:33 +01:00
Jakub Zych
baa0f20eb2 docs(phase-20): update tracking after wave 2 2026-10-30 19:13:00 +01:00
Jakub Zych
159cd5ecf4 docs(phase-20): update tracking after wave 1 2026-10-30 18:26:41 +01:00
Jakub Zych
16318b0c4a docs(34-06): roadmap plan progress 2026-10-29 21:39:42 +01:00